Laserfiche WebLink
• FSE noncompliance notifications <br />• Compliance inspection and follow -up efforts <br />• Sanitary sewer overflow (SSO) response and support <br />• Mobile FOG inspection deployment <br />1.2.2 Costa Mesa Sanitary District: 170G Program Management and Inspection Services <br />EEC currently provides many of the same services the City is requesting —FOG program management <br />and inspections, GIS support, CMMS support, and modeling services —to the Costa Mesa Sanitary <br />District (CMSD). Some project specifics are provided below: <br />• Enforcement project development and <br />management <br />• Cityworks implementation and support services <br />• FOG program development and management <br />• FSE database creation and management <br />• Infiltration and inflow analysis support <br />• GIS development and management <br />• FSE FOG inspections and follow -up <br />• CCTV source identification inspections <br />• Training services <br />• Hot -spot analysis <br />• Hydraulic modeling <br />1.2.3 Irvine Ranch Water District: FOG Program Management and Inspection Services <br />EEC conducted a FOG characterization study that included over 800 initial inspections within the Irvine <br />Ranch Water District's (IRWD's) service area and continues to support FOG program efforts, including <br />FSE inspection services. GRES are inspected to evaluate their size, operational status, and structural <br />condition. FOG program information and education is also provided to FSEs in IRWD. To enhance <br />analysis of the data collected, EEC developed a geodatabase. FSE and GRE data was further analyzed <br />with SSOs and sewer hotspots. Inspection data was instrumental in developing IRWD's FOG program; <br />analysis of the data provided a basis for prioritizing FSE permitting and inspections as well as optimizing <br />IRWD resources. The project scope included the following elements: <br />• Program creation and management <br />• Permitting inspections <br />• BMP and GRE inspections <br />• Compliance inspections <br />• Nonroutine customer support <br />• H2S testing and monitoring <br />• FSE plan submittal program development and management <br />"We have been etteeJnely pCeeceed with I lC "s ezperuse, pr ofessionalr'sm, <br />crud attention to detail concerning data management. " <br />Soha Vuairnia, FOG Progr°cnn Manager <br />Irvine Ranch Ualer Dis /riot <br />EEC Proposal to Provide FOG Program Services 4 July 31, 2014 <br />25E -19 <br />