My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25zFF - AGMT - PLANNING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
10/21/2014
>
25zFF - AGMT - PLANNING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 5:24:49 PM
Creation date
10/16/2014 4:03:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25FF
Date
10/21/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBI Group <br />TBI 10401 Von Karmen Avenue —Suite 110 <br />Wine CA 92812 USA <br />CROUP tel 949 833 5588 <br />fax 949 833 5811 <br />October 9, 2014 <br />Melanie McCann <br />City of Santa Ana <br />20 Civic Center Plaza, Ross Annex M -20 <br />Santa Ana, CA 92702 <br />AMENDMENT PROPOSAL NO. 2 - CIRCULATION ELEMENT UPDATE <br />This letter proposal details IBI Group's request for an amendment under our contract with the <br />City of Santa Ana for the Circulation Element Update project. Work efforts associated with this <br />request involve additional work will be incurred by IBI Group that was not included in our original <br />scope of services for this contract, The tasks listed below correspond to the tasks assigned in <br />the original scope of services for this contract, The proposed budget for completing this work is <br />attached to this letter. <br />Task 4 — Evaluation of Master Streets and Highway Plan <br />As part of the original contract, IBI Group completed an in- progress draft of the traffic analysis <br />for the updated Circulation Element, Including analysis of the 32 intersections and 18 roadway <br />segments where data was collected In Task 2. This analysis effort was focused around study <br />intersections and roadway segments that were anticipated to be Included in the traffic analysis <br />for the OCTA Master Plan of Arterial Highways amendment process and the preparation of the <br />traffic study for the project environmental document. The analysis was completed during the first <br />half of 2013, with the in- progress draft traffic analysis document submitted to the city in April <br />2014. <br />Subsequent to initial traffic analysis effort, the city identified additional street reclassifications <br />and modifications to the originally proposed reclassifications. These changes necessitated the <br />collection of additional traffic counts (conducted by the city) for inclusion in an updated traffic <br />analysis. Amendment No. 1 accommodated the additional coordination with OCTA to obtain <br />updated OCTAM model forecasts, and updates to the traffic analysis to include the new model <br />forecasts and an additional in the analysis 8 study intersections and 6 study roadway segments <br />beyond those previously identified in the original scope of services. <br />This new amendment Involves work efforts that will be completed by IBI Group to add additional <br />intersections to the traffic analysis, as well as an allocation of funds to address additional <br />potential street reclassifications or refinements to the OCTA model forecasts. At a minimum this <br />additional analysis effort will include the seven locations identified by OCTA in their email dated <br />July 29, 2014. The remaining budget assigned to this task ($8,000) would be allocated to <br />modifying the analysis to include up to eight additional intersections resulting from the proposed <br />reclassification of Broadway from a Secondary Arterial to a Divided Collector Arterial between <br />Civic Center Drive and First Street, refinements to the analysis as a result of updated OCTA <br />traffic modeling for this proposed reclassification, map updates, or additional administrative time <br />for IBI Group as part of the project management effort. IBI Group will work with the city to identify <br />the necessary work efforts for this remaining budget allocation and will invoice the amount as <br />expended. The traffic analysis work effort will Include completion of the new analysis, using <br />count data provided by the City of Santa Ana, <br />IBI Group Is a group orfirms providing professional servloes <br />25FF -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.