My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON HARRIS PCS, INC. 5 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
HOUSTON HARRIS PCS, INC. 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:49:35 PM
Creation date
10/29/2014 1:13:18 PM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON HARRIS PCS, INC.
Contract #
A-2014-174
Agency
PUBLIC WORKS
Council Approval Date
7/15/2014
Expiration Date
6/30/2015
Insurance Exp Date
6/24/2016
Destruction Year
2021
Notes
Amended by A-2014-174-01, -02
Document Relationships
HOUSTON HARRIS PCS, INC. 5A - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
HOUSTON HARRIS PCS, INC. 5B - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City shall be displayed continuously on the monitor and recorded on the video. The color of the overlay <br />information shall be adjusted so that it remains legible throughout the run. The footage relative to the <br />center of the manhole at the start of each run shall be set to accurately reflect a center of manhole starting <br />position of 0.00 feet regardless of where along the pipe and at what footage the run begins. <br />4. Digitally encoded video shall be, compressed with the WMV format with settings specified by the City. <br />Digital video shall be supplied to the City on stand-alone, hard disk drive systems with plug -and -play <br />capable USB comiections. Digital video files, Microsoft Access Database files, PDF report files and disk <br />directory naming conventions on Contractor -supplied hard disk systems shall be approved by the City <br />prior to the commencement of work. All disks and related components will become property of the City <br />and shall be included in the unit pricing for producing digital sewer video. <br />5. Every sewer main assessment shall begin with a view of the open manhole and shall proceed <br />uninterrupted in the downstream direction with the insertion of the camera into the manhole with the <br />subsequent sewer main assessment. Recording of video against the flow or passing through interim <br />manholes will only be allowed with prior approval of the City or when it can be shown that conditions <br />made it tmfeasible to lift an interim manhole cover or to record with the flow. <br />6. CCTV inspection, monitoring and recording shall only be performed by technicians that are NASSCQ <br />certified with a minimum of two years prior experience. The contractor shall furnish qualification details <br />and sample video for each technician so that their involvement in the praj ect can be approved by the City <br />prior to the commencement of work. The use of it video technician not approved by the City will be <br />considered sufficient cause for the rejection of any related work and any costs associated with re - <br />inspecting shall be at the Contractor's expense. <br />7. During inspection, the operating technician shall, along with an audio record of conditions, log a <br />computerized assessment of the recorded sewer. This assessment shall include the location of all laterals, <br />indicated infiltration, cracks, deflected joints, collapsed sections, ex -filtration, misalignment, roots, <br />deposits, and other conditions or data pertinent to the physical condition of the sewer. <br />8. The computerized format shall be provided as a separate Microsoft Access database file for each <br />quantity of digital video specified by the City. The contractor shall provide copies of the logs to the City <br />in PDF format. The Microsoft Access database shall include the following: <br />a) An inspection table listing each run number, the natne of the operator, the inspection date, <br />weather conditions, City supplied (the next sequential) database number, address or <br />intersection of the starting manhole, direction of the inspection with respcot to the flow, <br />sewer number as supplied by the City, material (VCP, PVC, etc.), diameter of the sewer, <br />length of the sewer, starting manhole 1D number and the ending manhole.lD numbor. <br />b) An assessment table listing the run number, starting and ending footage of every observation, <br />applicable assessment code, assessment code translation, additional remarks, starting and. <br />ending clock positions of observations where applicable. <br />c) "tabular formats (table names, column names and data types, etc.) shall conform to <br />specifications approved. by the City. <br />9. The contractor shall, submit the aforementioned video, and electrnnio reports summarizing all defects <br />and conditions specified above to'the City within 15 calendar days of completion of task. In addition, the <br />contractor shall retain copies of both the digital video and logs, for a term no less than that specified for <br />the agrcontont and shall make additional copies available to the City if the copies originally deilivered to <br />tho City are found to be either detective or incomplete. Upon acceptance of the agreement, the contractor <br />acknowledges that given the quantity of video to be. provided and the time it will take for the City to <br />review the video after delivery that the City's roquest for replacement data or video may not be timely. <br />to <br />25E-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.