My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON HARRIS PCS, INC. 5 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
HOUSTON HARRIS PCS, INC. 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:49:35 PM
Creation date
10/29/2014 1:13:18 PM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON HARRIS PCS, INC.
Contract #
A-2014-174
Agency
PUBLIC WORKS
Council Approval Date
7/15/2014
Expiration Date
6/30/2015
Insurance Exp Date
6/24/2016
Destruction Year
2021
Notes
Amended by A-2014-174-01, -02
Document Relationships
HOUSTON HARRIS PCS, INC. 5A - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
HOUSTON HARRIS PCS, INC. 5B - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lb. Databases shall be numbered in sequential order with any deliverable video recording reflecting the <br />same unique number differentiating each video, The starting database number will be specified by the <br />City at the beginning of the contract. Barring any notifications by the City to the Contractor of changes to <br />the sequence number, the contractor will be required to keep track of the next sequential number and use <br />it an the electronic database !'ales. The City will notify the Contractor of any changes to the sequence <br />number prior to requesting additional work. <br />11, Prior to the commencement of work, the City shall provide the contractors tablet PC equipped with <br />infraMAP(D software. Through the use of the infraMAPO software the contractor will have access to the <br />complete sewer system maps and data including but not limited to: manhole ID numbers, sewer main ID <br />numbers, street names and sewer main attributes. The City, through the infraMAPO software, will <br />designate the locations that are to be inspected. Use of the infraMAPO software by the contactor is <br />required. The City shall train the contractor in the use of infraMAPO as it relates to the documentation of <br />sewer cleaning and inspection activities. <br />12. If the contractor encounters conditions in the field that do not correspond to those indicated on the <br />maps, the contactor shall promptly inform the City of the discrepancy. if manholes or terminating <br />cleanouts are encountered that are not shown on the maps, the contractor shall use the next available <br />manhole number as shown on the maps for the video assessment and indicate the location where the <br />manhole was found. The City will incorporate those changes into the maps. The contactor will be <br />required to synohronize the tablet PC daily to ensure that both the City and the contractor have the most <br />up to date informatioii. When the contract is completed the contractor will be required to return the tablet <br />PC to the City. The use of non-standard or incorrectly numbered manholes by the contractor in either the <br />database or on the video overlay as shown on the digital video is cause for rejection of both the digital <br />video and the database in which it is referenced and any costs associated with re-videoing of the main, <br />modifications to the video overlay or rectification of the database that are necessitated by the Contractor's <br />failure to use designated naming conventions will be borne entirely by the contractor. <br />13. Any digital media delivered to the City shall be labeled with the following information; <br />a) Street name or location of sewer main and or sewer manhole if not in a City street, and lirnits <br />of inspection for the sewer reach included; (e.g., McFadden Avenue sewer between Grand <br />and Standard) or the task name given by the City. <br />b) Date of inspection. <br />c) 'Database number <br />14. All digital reports shall be in (pdf) format and contain as a minimum the following information; <br />a) Date and time of inspection <br />b) Name of contractor <br />c) Names of operating teohnician/inspector <br />(1) Pipe size, material, and total length <br />e) Number and street or intersection location and the City designated number for the starting <br />manhole. <br />f) Number and street or intersection location and the City manhole number for the ending <br />manhole. <br />g) Direction of inspection. (upstream or downstream). <br />h) The database number. <br />25E-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.