My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON HARRIS PCS, INC. 5 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
HOUSTON HARRIS PCS, INC. 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:49:35 PM
Creation date
10/29/2014 1:13:18 PM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON HARRIS PCS, INC.
Contract #
A-2014-174
Agency
PUBLIC WORKS
Council Approval Date
7/15/2014
Expiration Date
6/30/2015
Insurance Exp Date
6/24/2016
Destruction Year
2021
Notes
Amended by A-2014-174-01, -02
Document Relationships
HOUSTON HARRIS PCS, INC. 5A - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
HOUSTON HARRIS PCS, INC. 5B - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rnprlerttentation Plait <br />i <br />ji <br />This process is repeated for each line segment. <br />Video van units are equipped with backup cameras as well as replacement parts along with <br />09 <br />trained, qualified Individuals who are able to make minor field repairs, eliminating costly <br />downtime. Production levels vary between 2,f1D0 F and q,O p ip'paper 8 -hour day. <br />These numbers are based on normal field cooditiens. Excessive debris and or numerous <br />remota setups encountered In the #ield may cause these numbers to decrease. <br />Manhole inspection.... <br />MY Effective manhole inspection and rehabilitation is necessary to remove excessive manhole <br />PnNtr3alon and inflow, Improve manhole structural integrity, address public safety related <br />11) issues, and implement general system maintenance needs. Houston and Harris will provide <br />expertise and services for imp€emonting successful manhole inspection. Various inspection <br />techniques and procedures forartalysis, design, and construction exist. Houston and Harris <br />610 personnelutilize the NASSOO Manhole Assessment Certification Program (MACP), and are <br />MRCP Lovei I certified. Throughlnspections, system yr`i'e Hale oonc t€ons will be Identified, <br />system maps will be updated, and plpellne maintenance needs will be evaluated, Reports, <br />utilizing valid MACP defect codas will be provided to city personnel as requested. Houston <br />jo and Harris personnel are capable, experienced and pro€essionaJ• Adequate staffing levels <br />will be maintained to ensure tlmellnes and established schedules are met. <br />Quality Control; Data Conversion <br />All recordings are stored on a removable, digital hard drive which consists of videos, Jpegs <br />and a Microsoft Access database for the Inspected work and are delivered to the Houston & <br />& Harris Quality Centro€ Department daily. <br />Clryol SkalaAna B 020 <br />Mm <br />Closatl 6lreuil Tnlevinioninion(GCTVr In.pnGl4n of Sanitary "owuls <br />I <br />MEN2187!Barb$Road <br />r�� N Grana rwrpo, cA 93813 <br />'fid' l� !4uh,;1u, 707 1N 9970 P 9094?2oe4 [ F t <br />F,a r <br />25E-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.