My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON HARRIS PCS, INC. 5 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
HOUSTON HARRIS PCS, INC. 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:49:35 PM
Creation date
10/29/2014 1:13:18 PM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON HARRIS PCS, INC.
Contract #
A-2014-174
Agency
PUBLIC WORKS
Council Approval Date
7/15/2014
Expiration Date
6/30/2015
Insurance Exp Date
6/24/2016
Destruction Year
2021
Notes
Amended by A-2014-174-01, -02
Document Relationships
HOUSTON HARRIS PCS, INC. 5A - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
HOUSTON HARRIS PCS, INC. 5B - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Implemezztation Plaza <br />In order to provide maximum efficiency, Houston and Harris coordinates cleaning and <br />video services. Maps are reviewed regufarly by both the cleaning and video operators. <br />Coordination of tasks such as, manhole locations, safety and traffic needs, as well as, <br />debris and flow are regularly communicated across both services by the operators. <br />The following procedures will be followed on a dally basis: <br />After reviewing the maps to determine the start location, the operator assossas manhole <br />locations to ensure the safest positioning of the vehiole, and sets-up to begin the video <br />process. Traffic oprilrol will be provided per Work Area Traffic Control Handbook when <br />necessary. included In set-up procedures are assurances of traffic cones around work area <br />and equipment and use of gas detector meter readings Indicating safe removal of manhole <br />lids. Once the location is deemed safe, the manhole lid is removed. <br />_.pert..._.... ..t ocey lineIdentification_._. nformation including, manhole number; <br />The operator enters.t line- information <br />line 1D number, and pipe material & size into data base. The camera is then placed on the <br />$ ground next to the open manhole. Using the camera view, the: operator records the visual <br />inspection of the rungs, the cone and shaft, in-coming and out-going lines to assess <br />` condition- The operator lowers the camera into the channel to record and view the invert of <br />the. pipe. <br />Once the invert view is rocorded, the video equipment Is set-up for inspection of the line, <br />The operator's voice is rerarded reading thevideo overlay. The operator controls the camera <br />» in. the line to video all views and is responsible for proper camera height and lighting, Pip& <br />defects such as, breaks, cracks, off-set joints, roots, grease, infiltration and ox-filtration are <br />noted In audio and through data entry. Defects are archived as Jpeg files. Other <br />obsarvalions such as SWVil "n connections, break-in connections and protruding taps are <br />also noted. <br />CI(Y of Sant" '%. R(d dt 3024 <br />Cloxd Chcult relgvlaiwi 1CCNytnipecllan of Snnllary 8evmrr <br />2181 Barton Road <br />S+i %d tiA/W,�,YG rand Tarnno„A 92317 <br />`� .t ,y ,Tax w nos.aaz•assar <br />90.42 ONIF <br />p <br />L+r�cl <br />25E-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.