My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W.A. RASIC CONSTRUCTION COMPANY, INC.-2014
Clerk
>
Contracts / Agreements
>
W
>
W.A. RASIC CONSTRUCTION COMPANY, INC.-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 3:19:19 PM
Creation date
10/30/2014 3:09:25 PM
Metadata
Fields
Template:
Contracts
Company Name
W.A. RASIC CONSTRUCTION COMPANY, INC.
Contract #
A-2014-228
Agency
PUBLIC WORKS
Council Approval Date
9/16/2014
Expiration Date
9/11/2017
Insurance Exp Date
5/1/2015
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A complete team that understands a sound / flexible project approach, competitive <br />pricing and partnering with all parties to ensure project goals are met <br />The following is a small sample of recent / relevant project experience;: <br />- Response to over 500 emergencies in calendar year 2011 (multiple agencies and private <br />owners), with similar amounts in 2012 through present <br />- LADWP River Supply Conduit — Lower Reach involved 11,200 If of 96" steel water <br />pipe, 1,4341f of 108" jacked casing, metering vaults and extensive traffic control <br />- LADWP City Trunk Line South Unit II involved installation of 12,800 If of 30" to 66" <br />steel water line of which 3,000 if will be installed via earth pressure balanced TBM <br />- MWD Colorado Rehabilitation Project involved over 250 personnel spread out over a <br />230 mile section of the Colorado River Aqueduct working 24 hours a day 7 days a week <br />to comply within a strict shutdown period <br />- Fort Irwin Design/Build wastewater treatment plant, pipelines & related civil <br />improvements <br />. RWD modified Design/Build reclaimed water transmission & distribution systems <br />involving some 80,000 if of piping and excavations to 28' deep <br />- LA County Sanitation District Joint Outfall "C" involved the installation of 5,6001f of <br />90" RGRCP T -Lock pipe with significant amount being installed via tunnel method <br />- EMWD Murrieta Pipe Bursting Project involved the installation of 5,8001f of 20" IIDPE <br />installed by bursting method to upgrade existing 12" & 15" V CP sewer <br />MWD Penis Valley Pipeline North involved the installation of 2.7 miles of 96" & 108" <br />steel water line, open face tunnel section, cast -in -place valve vaults & metering facility <br />and extensive hard rock excavation <br />Disneyland Resort BOH Facility Enhancement project involved extensive relocations of <br />existing utilities and installation of new water, sewer, air, gas, chilled and hot water <br />systems, earthwork and paving improvements <br />Our ability to respond to your firms needs under this contract can be seen in our comprehensive <br />emergency response call out system that is in place and our facilities located in multiple cities <br />and supplemented by resources from our on -going construction projects throughout Southern <br />California. Although our corporate facility is located in Long Beach, our operations facility in <br />Bell Gardens and satellite locations in Perris, Las Vegas, & Rio Vista give us a significant <br />presence and ensure our ability to provide your firm with the necessary services as we do with <br />many other agencies in the area. <br />With the location of our yard, equipment, and full -time staff we can respond within two hours <br />g from receiving an emergency call, with most being responded within an hour. We have fully <br />Am <br />equipped emergency response trailers that the foremen can quickly attach to which provide the <br />RK <br />'ority of equipment and tools necessary to complete the repairs. <br />for after-hours emergencies. We maintain a list of employees who have made <br />ble for such work. We also maintain emergency numbers for our key water <br />
The URL can be used to link to this page
Your browser does not support the video tag.