My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:34:16 AM
Creation date
11/17/2014 10:08:16 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
9/16/2014
Expiration Date
2/5/2016
Destruction Year
2019
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award to All American Asphalt for <br />Class II Bikeway and Alley/Street Improvements <br />September 16, 2014 <br />Page 2 <br />The improvements for the Class II Bikeway on Chestnut Avenue from Standard Avenue to Grand <br />Avenue include widening the roadway along the north side between Standard Avenue and Santa Fe <br />Street to accommodate the bikeway within the existing right-of-way. Construction of the Chestnut <br />bike lanes is part of the City's approved Bikeway Master Plan. This project also further develops the <br />City of Santa Ana Golden Loop Bikeway that will connect to the existing Class I Maple Bike Trail and <br />to the future Class II Bikeway on Grand Avenue. Details of the improvements include constructing <br />new street pavement; new concrete curbs, gutters, sidewalks, cross gutters, driveway approaches, <br />and curbs ramps; and installing new street trees. <br />The Alley Improvement project will replace asphalt roadway with concrete pavement in two alley <br />segments (Exhibit 1). The existing asphalt in these locations is deteriorated with numerous potholes, <br />excessive cracking, and evidence of pavement failure. <br />The street improvements on Chestnut Avenue from Broadway to Main Street have been identified as <br />a high priority need by the City's Pavement Management System. The pavement has deteriorated <br />due to weather, age, and use. Street rehabilitation will reconstruct the existing concrete pavement <br />and replace damaged curb, gutter, sidewalk, driveways, and ramps. <br />Bid procedures were followed as established by the City's Municipal Code and in adherence to the <br />Public Contracts Code. The Notice Inviting Bids was advertised on July 25 and 26, 2014, and bids <br />were opened on August 14, 2014. The following is a summary of the bid invitations mailed and <br />received, and the bid results: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices 18 <br />Contractors requesting bidding documents 17 <br />Bids received 5 <br />Bids received from Santa Ana contractors 0 <br />Bid Results Summary <br />Rank <br />Name of Firm <br />Location <br />Bid <br />1 <br />All American Asphalt, Inc. <br />Corona <br />$631,573 <br />2 <br />Excel Paving Company <br />Long Beach <br />$671,962 <br />3 <br />Beador Construction Company, Inc <br />Corona <br />$695,700 <br />4 <br />C.S.Legacy Construction, Inc. <br />Pomona <br />$716,546 <br />5 <br />R.J. Noble Company <br />Orange <br />$787,769 <br />All American Asphalt submitted the lowest responsive bid of $631,573, which is comparable to the <br />Engineer's Estimate of $600,085. Based on the bids received, staff recommends awarding this <br />contract to All American Asphalt. <br />
The URL can be used to link to this page
Your browser does not support the video tag.