Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />All splices of the wire shall be made securely and covered thoroughly with a Direct Bury Splice <br />Kit, 3M DBY /DBR or approved equal. The Contractor shall schedule and conduct a <br />conductivity test on completion of the water main installation and prior to placement final <br />pavement. If the conductivity test fails, the Contractor shall be responsible for making the <br />necessary repairs, including but not limited to excavation, repair and retesting until passing <br />results are achieved. Additional compensation will not be allowed therefore. <br />3.11 RESILIENT WEDGE GATE VALVES <br />This work shall consist of furnishing and installing gate valves, including risers with valve <br />boxes, and P.C.C. collars where indicated on the plans. All work shall conform to City of Santa <br />Ana Standard Plans 1410. <br />Gate valves shall be of the size and configuration as indicated on the plans and shall be <br />AWWA and ULFM tested, resilient wedge with operating nuts and non - rising stems, and shall <br />be designed for a minimum working pressure of 200 psi and be tested at 400 psi. Valves shall <br />be bubble -tight at the working pressure. Gate valves shall be Clow, Mueller, Renselear, or <br />approved equivalent. Valves shall have all stainless steel nuts and bolts and shall be <br />manufactured in accordance with AWWA C509 Standards. Valve linings and coatings shall be <br />made in accordance with AWWA C -550. <br />All valve to fitting connections shall be flanged. Valves for lateral lines shall be bolted directly <br />to main line tee, unless otherwise noted on the plans. Where it is necessary to install a <br />reducer or other type of fitting between the lateral valve and main line, said fitting shall be <br />flanged at both ends. <br />All valve box frame and covers shall require P.C.C. collars and shall be adjusted to finished <br />grade following paving operations. Collars on arterial and collector streets shall be <br />constructed using Rapid Set® Concrete per City of Santa Ana Standard Plan No. 1410. <br />Contractor shall have Rapid Set® Set Control retardant on job site when adjusting valve frame <br />and covers. Contractor shall warranty all valve collars constructed with Rapid Set® for a period <br />of 2 years. If collars are found to be deficient during the warranty period, Contractor shall, at <br />his expense, reconstruct collars per Standard Plan No. 1410. <br />The contract unit price for each size of valve shall be considered full compensation for <br />furnishing all labor, materials, tools, equipment and incidentals to accomplish the work as <br />specified herein including valve box frame and cover with PCC collar, PVC riser pipe and all <br />appurtenances, adjustment to finished grade, and no additional compensation will be allowed <br />therefore. <br />T -3p <br />23A -111 <br />