CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />3.12 WATER SERVICE AND FIRE LINES <br />All work shall conform to City of Santa Ana Standard Plans and meet all A.W.W.A. <br />Specifications. All ductile or cast iron pipe, fittings, valves, and appurtenances buried <br />underground shall be wrapped with 10 mils polyethylene sheeting. Any existing or connecting <br />pipe and appurtenances that are exposed as a result of this pipe installation shall also be <br />wrapped with polyethylene sheeting. <br />Service laterals shall be installed perpendicular to the centerline of the main. <br />Removal and replacement of sidewalk, as necessary to facilitate water service meter <br />installation, shall be included as part of this work. All work shall conform to City of Santa Ana <br />Standard Nos. 1401, 1402, and 1104. <br />The City shall furnish and install the water meter after all other work is complete. <br />Note: Angle meter stops are not acceptable. The connection to the meter coupling shall be a <br />curb stop with locking wing nut. <br />For all water service relocations and installations, Contractor shall notify residents a minimum <br />of 24 hours prior to any interruption in service. Every effort shall be made to minimize the <br />inconvenience to the customer. Contractor shall coordinate these activities with the City of <br />Santa Ana Water Resources Division a minimum of four (4) working days prior to beginning <br />work on services. When necessary, such work shall be performed after -hours or on weekends <br />as directed by the Engineer. In no case shall any property be without service for more than <br />four (4) hours. In special circumstances, emergencies, or when directed by the Engineer, <br />Contractor shall provide temporary service lines, with approved NSF hoses, to prevent any <br />interruption in service. <br />1" & 2" New Water Service Construction: <br />This work shall consist of constructing a complete new water service where indicated on the <br />plans, and shall include service saddle, corporation stop, curb stop, copper tubing, meter box, <br />and appurtenances all in accordance with City of Santa Ana Std. Plan No 1401 and 1402. <br />3" and Greater Relocating Services and Fire Lines: <br />Relocation of these facilities may be accomplished by installing new portions of pipe as <br />necessary to complete the relocation and connecting back to the existing service line. Pipe <br />may be either ductile iron or C -900, PVC. If relocation requires an increase in depth or <br />horizontal realignment of the pipe, 45° Bends shall be used to re -route the pipe. Thrust blocks <br />shall be required in accordance with City of Santa Ana Standard Plans Nos. 1403A, 1403B, <br />1403C, and 1412. All pipe trenches shall have 6" minimum of sand bedding beneath the pipe <br />and sand backfill over the pipe compacted to 90% relative compaction. <br />T -3q <br />23A -112 <br />