My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:00:25 PM
Creation date
11/26/2014 2:51:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />and parking areas and at shorter intervals if conditions warrant. The Contractor shall provide <br />the signs and will be responsible for adding the dates and hours of closure to the signs. <br />4.02 PROJECT PHASING AND LANE REQUIREMENTS <br />The contractor shall construct the project per WATCH. <br />1. Pedestrian crossings: Maintain access at all pedestrian crossings at all times. <br />2. All major intersections: Construction shall be limited to weekend work only. <br />Maintain minimum one through lane in each direction at all times. Keep left turn <br />lane open at intersection until construction is at the left turn lane. <br />3. Work at 17th Street and Flower Street shall be limited to weekend work only. <br />Maintain minimum one through lane in each direction at all times. Keep left turn <br />lane open at intersection until construction is at the left turn lane. <br />4.03 WORKING HOURS: <br />The Contractor's activities shall be confined to the allowable working hours of the selected <br />bid. The working hours under Base Bid Night Work or Alternate #1 Day Work are as follows: <br />Base Bid Night Work: <br />1. From 7:00 p.m. to 5:00 a.m. Monday through Friday. <br />Alternate #1 Day Work <br />1. From 7:00 a.m. to 5:00 p.m., Monday through Friday, within work areas having <br />either no lane closures or having continuous lane closures, i.e. 24 -hour closures <br />lasting more than one day. <br />2. From 9:00 a.m. to 3:00 p.m., Monday through Friday, for work requiring <br />temporary lane closures, i.e. those having less than a 24 -hour duration, and for <br />work at major intersections. <br />3. All major intersections: Construction shall be limited to weekend work only. <br />Maintain minimum one through lane in each direction at all times. Keep left turn <br />lane open at intersection until construction is at the left turn lane. <br />4. Work at intersection of 17th Street and Flower Street shall be limited to <br />weekend work only. <br />T -4b <br />23A -121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.