My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:00:25 PM
Creation date
11/26/2014 2:51:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />All temporary street /lane closure shall be opened to traffic during non - working hours. <br />Deviation from these hours /days shall not be permitted without the prior consent of the Traffic <br />Engineer, except in emergencies involving immediate hazard to persons or property, or as <br />specified otherwise <br />4.04 ADVANCE WARNING SIGNS: <br />4.04.1 Changeable Message Signs (CMS): <br />The Contractor shall provide up to 8 solar powered CMS two weeks prior to <br />commencement of construction. The signs shall be posted in advance of each <br />end of the project for the duration of the project. These CMS can be LED full <br />matrix or letter matrix or equivalent, with preferred 8" letter (minimum 6 "). The <br />overall width of the sign including the trailer shall not exceed 8'. <br />• Prior to the start of the construction, display the following message: <br />Screen 1: <PROJECT STREET NAME> CONSTRUCTION <br />Screen 2: BEGINS xx /xx /xx <br />• When construction started, display the following message: <br />Screen 1: <PROJECT STREET NAME> UNDER CONSTRUCTION <br />Screen 2: USE ALT ROUTE <br />The messages and sign location may be changed at any time as <br />determined by the Engineer. <br />4.04.2 Static Warning Signs: <br />The Contractor shall post 2 static advance warning signs at least two weeks <br />prior to commencement of construction stating: <br />MAJOR ROAD CONSTRUCTION ON <br /><PROJECT STREET NAME> <br />FROM <DATE> TO <DATE> <br />EXPECT DELAYS <br />USE ALTERNATE ROUTE <br />The signs shall be posted in advanced of each end of the project. These warning <br />signs shall be sized (5' height by 6'wide minimum) to fit the above wordings <br />with orange reflective background, black border and 7" black letters. If sign is <br />T -4c <br />23A -122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.