My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:00:25 PM
Creation date
11/26/2014 2:51:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />installed on the sidewalk, there shall be enough clearance for pedestrian access <br />underneath the sign. The Engineer will determine sign placement and the dates. <br />In the event of construction delays that go beyond the posted completion date <br />on the sign, the contractor shall keep the completion date on the sign updated <br />on a monthly basis or as directed by the Engineer. <br />4.05 TRAFFIC CONTROL PLAN PREPARATION AND SUBMITTAL: <br />Prior to start of project, the contractor shall submit traffic control plan for approval on all <br />construction phases and /or stages. The traffic control plan shall be prepared by registered <br />Traffic /Civil Engineer specializing in Traffic Control. Unless directed otherwise, the traffic <br />control plan shall conform to the format and requirements identified in the CSASP 1125F. <br />The submittal and review process is as follows: <br />• Within 1 week of receiving Award of Contract, contractor shall meet with the City <br />to discuss the proposed traffic control plan and construction phasing <br />• Traffic control plans must be submitted within 4 weeks of receiving Award of <br />Contract. <br />• The City will review all 1st submittal in 2 weeks. <br />• The City will review subsequence re- submittal with check print in 1 week. <br />• Contractor may submit traffic control plan for each Phase separately. <br />• Approval of the traffic control plan may take more than 2 submittals depending <br />on the completeness and thoroughness of the plan. <br />• Incomplete traffic control plan will be rejected without reviewing. The City will <br />not be responsible for any delay of the project due the incomplete submittal of <br />the traffic control plan. <br />4.06 PAYMENT <br />The lump sum price shall include full compensation for all traffic control, including but not <br />limited to preparing traffic control plan, sandblasting, barricades, temporary striping, <br />move -ins, and the above warning signs and no additional compensation will be allowed <br />therefore. <br />T -4d <br />23A -123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.