My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:00:25 PM
Creation date
11/26/2014 2:51:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />cause following written approval of the City of Santa Ana. This clause applies to both DBE and <br />non -DBE subcontractors. <br />1.15 TEMPORARY RECESSED STEEL PLATE BRIDGING <br />When backfilling operation of an excavation in the travel way, whether transverse or <br />longitudinal cannot be properly completed within a work day, recessed steel plate bridging <br />with a non -skid surface and shoring may be required to preserve unobstructed traffic flow. In <br />such cases, the following shall apply: <br />1. Steel plate installation shall be recessed by milling existing pavement to set flush with <br />finish grade. <br />2. Steel plate shall fit snug and installed to operate with minimum noise. Bridging shall be <br />secured against displacement. <br />3. Steel plate used for bridging must extend a minimum of twelve (12 ") inches beyond the <br />edge of the trench. <br />4. The pavement shall be cold planned a depth equal to the thickness of the plate and to a <br />width and length equal to the dimensions of the plate. <br />Multiple steel plates shall be butted and tack welded as needed to secure plates 6" minimum. <br />The trench shall be adequate to support the bridging and the traffic load. Contractor shall be <br />responsible for determining whether shoring is necessary. The Contractor shall be responsible <br />for the appropriate selection and maintenance of the steel plates, and shoring. <br />Unless specified, recessed steel plate bridging at any given location shall not exceed four (4) <br />consecutive working days in any given week. Backfilling of excavation shall be covered with a <br />minimum of three (3 ") inches of temporary layer of cold asphalt concrete. <br />The following table shows the required minimal thickness of steel plate bridging for a given <br />trench width: <br />Trench Width Minimum Plate Thickness <br />1.0 foot % inch <br />1.5 foot % inch <br />2.0 feet 7/8 inch <br />3.0 feet 1 inch <br />4.0 feet 1% inch <br />T -lg <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.