My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - PROPOSED WATER AND SEWER RATE ADJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
65B - PROPOSED WATER AND SEWER RATE ADJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2014 8:46:02 AM
Creation date
11/26/2014 3:35:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
65B
Date
12/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
42 <br />SEWER RATE STUDY I City of Santa Ana, CA <br />$3,172,200, which corresponds to Table 15, Line 12, Column 1 is shown allocated to the six primary cost <br />components on Line 10. Note that routine capital outlay is excluded from 0 &M expenses as it is a capital <br />element in that it deals with assets. Routine capital outlays are budgeted under 0 &M because of <br />accounting rules governing capitalization activities, but from a COS- perspective, it is a capital - related <br />item. <br />Table 17: Allocation of 0 &M Expenses to Functional Cost Components in Thousands of Dollars <br />Allocation of Capital Costs <br />The estimated investment in wastewater and stormwater facilities is allocated to appropriate cost <br />components as a basis for the further distribution of capital related costs to the various customer <br />classes. The allocation of estimated plant investment serving wastewater customers for the Test Year is <br />shown in Table 18. The total plant investment of $16,620,500 shown on Line 4 represents the estimated <br />Test Year original cost less accumulated depreciation of plant in service. <br />The allocation of specific items of investment to the cost categories, as shown, is made on the basis <br />previously described and shown in Table 16. For example, collection items are related to flow and these <br />65B -201 <br />NOVEMBER 2014 <br />Personnel <br />1 <br />(Collection) <br />1,900.9 <br />1,232.4 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />668.5 <br />Contractual <br />2 <br />(Collection) <br />1,914.3 <br />1,255.5 <br />0.0 <br />0.0 <br />0.0 <br />658.8 <br />0.0 <br />Commodities <br />3 <br />(Collection) <br />252.2 <br />252.2 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />Cross Charges <br />4 <br />(Collection) <br />517.0 <br />517.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />Transfers <br />5 <br />(Monitoring) <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />6 <br />Subtotal <br />$4,584.4 <br />$3,257.1 <br />$0.0 <br />$0.0 <br />$0.0 <br />$558.8 <br />$668.5 <br />Less Other Revenues <br />Misc. Revenues <br />7 <br />(Other) <br />57.2 <br />44.9 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />12.3 <br />Other <br />Adjustments <br />8 <br />(Other) <br />1,355.0 <br />1,063.7 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />291.3 <br />9 <br />Subtotal <br />$1,412.2 <br />$1,108.6 <br />$0.0 <br />$0.0 <br />$0.0 <br />$0.0 <br />$303.6 <br />Net Operating <br />10 <br />Expenses <br />$3,172.2 <br />$2,148.5 <br />$0.0 <br />$0.0 <br />$0.0 <br />$658.8 <br />$364.9 <br />Allocation of Capital Costs <br />The estimated investment in wastewater and stormwater facilities is allocated to appropriate cost <br />components as a basis for the further distribution of capital related costs to the various customer <br />classes. The allocation of estimated plant investment serving wastewater customers for the Test Year is <br />shown in Table 18. The total plant investment of $16,620,500 shown on Line 4 represents the estimated <br />Test Year original cost less accumulated depreciation of plant in service. <br />The allocation of specific items of investment to the cost categories, as shown, is made on the basis <br />previously described and shown in Table 16. For example, collection items are related to flow and these <br />65B -201 <br />NOVEMBER 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.