My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - PROPOSED WATER AND SEWER RATE ADJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
65B - PROPOSED WATER AND SEWER RATE ADJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2014 8:46:02 AM
Creation date
11/26/2014 3:35:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
65B
Date
12/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
68 <br />WATER RATE STUDY j City of Santa Ana, CA <br />Table A - 1: Water System Expected Useful Lives <br />CHLOR <br />PSI Chlorination Unit <br />12 <br />ELEV_TANK <br />Elevated Water Storage Tank <br />75 <br />GENH <br />Hydro Generator <br />60 <br />METR <br />Flow meter (above ground meters) <br />15 <br />MWD <br />Metropolitan Water District <br />75 <br />(MWD) Connection <br />PRV <br />Pressure Reducing Station - <br />50 <br />PUMP_W <br />Pump and Motor (non- <br />10 <br />submersible) <br />PUMPS_W <br />Submersible Pump <br />10 <br />VALV CNTL <br />Cla -Val Control Valves <br />50 <br />WELL <br />Well <br />75 <br />WTRM_AC <br />Water Mains made of AC pipe <br />60 <br />WTRM CI <br />Water Mains made of Cl pipe <br />75 <br />WTRM CMLC <br />Water Mains made of CMLC pipe <br />75 <br />WTRM_CYL <br />Water Mains made of Cylinder pipe <br />75 <br />WTRM_DI <br />Water Mains made of Ductile Iron <br />100 <br />pipe <br />WTRM_PVC <br />Water Mains made of PVC pipe <br />75 <br />WTRM STL <br />Water Mains made of Steel pipe <br />75 <br />WTRM_UNK <br />Water Mains made of unknown <br />60 <br />material <br />Water Production Facilities <br />The asset classes within the water production facilities are composed of various asset categories. Table <br />A - 2 through A -4 present the replacement costs of these various asset categories. Where possible, Black <br />& Veatch used current construction estimates available from projects in the surrounding area. All <br />replacement costs are in 2012 dollars. <br />Table A - 2: Wells, Meters and Valves Replacement Costs <br />■�:1L' 111 •[cll:lg9�_[Mi�41�t�1f.71'1� �:i79IeUi�4liPIlU�7� <br />Wells All sizes $562,800 <br />Meters All sizes $8,800 <br />Control Valves All sizes $5,000 <br />M L� •• ' <br />NOVEMBER 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.