City of Santa Ana, CA I WATER RATE STUDY
<br />Table A - 3: Water Pumps and Hydro Generator Replacement Costs
<br />Pumps (hp) 1 10 $14,600
<br />11 30 $18,000
<br />31 100 $24,800
<br />101 250 $49,500
<br />Hydro Generator 200kw $400,000
<br />Table A -4: Tanks, Chemical Feed and Misc. Replacement Costs
<br />Up to 500,000 $540,200
<br />Up to 1,000,000 $696,000
<br />Up to 2,000,000 $1,056,000
<br />Reservoirs (by gal) Up to 4,000,000 $1,680,000
<br />Up to 6,000,000 $2,232,000
<br />Up to 8,000,000 $2,880,000
<br />Up to 10,000,000 $3,848,000
<br />Misc. Structures (per sq. ft.) All sizes $130
<br />Water Distribution Facilities
<br />The water pipe asset class incorporates pipe, and associated appurtenances (incl. pipe isolation valves,
<br />and hydrants). These types of assets are grouped together as it is far more practical (cost and
<br />minimization of disruption) to replace appurtenances associated with a pipe within portions of each
<br />water system at the same time. The replacement costs for this asset class used for the analysis varies by
<br />pipe size as shown in Table A - 5. All replacement costs are in 2012 dollars.
<br />BLACK & VEATCH I Appendix A Refurbishment & R -,�' . ^ o sc am
<br />Lm � •
<br />10.0
<br />Up to 50,000
<br />$184,000
<br />Up to 100,000
<br />$280,000
<br />Elevated Tanks (by gal)
<br />Up to 250,000
<br />$776,000
<br />Up to 500,000
<br />$1,380,000
<br />Up to 750,000
<br />$1,675,000
<br />Up to 1,000,000
<br />$2,400,000
<br />Chlorination Unit
<br />All sizes
<br />$56,000
<br />MWD Connections
<br />All sizes
<br />$250,000
<br />Pressure Reducing Stations
<br />All sizes
<br />$72,500
<br />Misc. Structures (per sq. ft.) All sizes $130
<br />Water Distribution Facilities
<br />The water pipe asset class incorporates pipe, and associated appurtenances (incl. pipe isolation valves,
<br />and hydrants). These types of assets are grouped together as it is far more practical (cost and
<br />minimization of disruption) to replace appurtenances associated with a pipe within portions of each
<br />water system at the same time. The replacement costs for this asset class used for the analysis varies by
<br />pipe size as shown in Table A - 5. All replacement costs are in 2012 dollars.
<br />BLACK & VEATCH I Appendix A Refurbishment & R -,�' . ^ o sc am