Laserfiche WebLink
City of Santa Ana, CA I WATER RATE STUDY <br />Table A - 3: Water Pumps and Hydro Generator Replacement Costs <br />Pumps (hp) 1 10 $14,600 <br />11 30 $18,000 <br />31 100 $24,800 <br />101 250 $49,500 <br />Hydro Generator 200kw $400,000 <br />Table A -4: Tanks, Chemical Feed and Misc. Replacement Costs <br />Up to 500,000 $540,200 <br />Up to 1,000,000 $696,000 <br />Up to 2,000,000 $1,056,000 <br />Reservoirs (by gal) Up to 4,000,000 $1,680,000 <br />Up to 6,000,000 $2,232,000 <br />Up to 8,000,000 $2,880,000 <br />Up to 10,000,000 $3,848,000 <br />Misc. Structures (per sq. ft.) All sizes $130 <br />Water Distribution Facilities <br />The water pipe asset class incorporates pipe, and associated appurtenances (incl. pipe isolation valves, <br />and hydrants). These types of assets are grouped together as it is far more practical (cost and <br />minimization of disruption) to replace appurtenances associated with a pipe within portions of each <br />water system at the same time. The replacement costs for this asset class used for the analysis varies by <br />pipe size as shown in Table A - 5. All replacement costs are in 2012 dollars. <br />BLACK & VEATCH I Appendix A Refurbishment & R -,�' . ^ o sc am <br />Lm � • <br />10.0 <br />Up to 50,000 <br />$184,000 <br />Up to 100,000 <br />$280,000 <br />Elevated Tanks (by gal) <br />Up to 250,000 <br />$776,000 <br />Up to 500,000 <br />$1,380,000 <br />Up to 750,000 <br />$1,675,000 <br />Up to 1,000,000 <br />$2,400,000 <br />Chlorination Unit <br />All sizes <br />$56,000 <br />MWD Connections <br />All sizes <br />$250,000 <br />Pressure Reducing Stations <br />All sizes <br />$72,500 <br />Misc. Structures (per sq. ft.) All sizes $130 <br />Water Distribution Facilities <br />The water pipe asset class incorporates pipe, and associated appurtenances (incl. pipe isolation valves, <br />and hydrants). These types of assets are grouped together as it is far more practical (cost and <br />minimization of disruption) to replace appurtenances associated with a pipe within portions of each <br />water system at the same time. The replacement costs for this asset class used for the analysis varies by <br />pipe size as shown in Table A - 5. All replacement costs are in 2012 dollars. <br />BLACK & VEATCH I Appendix A Refurbishment & R -,�' . ^ o sc am <br />Lm � • <br />10.0 <br />