My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - SANTA ANA GRADE SEPARATION PROJECT_Exhibit 2 in Color
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
19E - SANTA ANA GRADE SEPARATION PROJECT_Exhibit 2 in Color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:13:58 PM
Creation date
12/3/2014 4:08:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
12/2/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana 8/18/2014 <br />Santa Ana Boulevard Grade Separation Project <br />Preliminary Engineering Estimate <br />No. <br />Item Description <br />Unit of <br />Measure <br />Unit Cost <br />Quantity <br />Item Total <br />Engineering: <br />29 <br />Final PS&E Design (10%) <br />LS <br />$ <br />4,329,000 1 <br />$ 4,329,000 <br />30 <br />Construction Engineering (15%) <br />LS <br />$ <br />6,493,500 1 <br />$ 6,493,500 <br />Engineering Total: <br />$ 10,822,500 <br />Right of Way: <br />31 <br />Right of Way Acquisition <br />LS <br />$ <br />12,460,486 1 <br />$ 12,460,486 <br />Subtotal: <br />$ 12,460,486 <br />25 % Contingency: <br />$ 3,115,122 <br />Right of Way Total: <br />$ 15,575,608 <br />32 <br />Right of Way Consultant Support <br />LS <br />$ <br />1,500,000 1 <br />$ 1,500,000 <br />Total Project Cost (not including PA/ED): <br />$ 71,188,108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.