Laserfiche WebLink
City of Santa Ana 8/18/2014 <br />Santa Ana Boulevard Grade Separation Project <br />Preliminary Engineering Estimate <br />No. <br />Item Description <br />Unit of <br />Measure <br />Unit Cost <br />Quantity <br />Item Total <br />Engineering: <br />29 <br />Final PS&E Design (10%) <br />LS <br />$ <br />4,329,000 1 <br />$ 4,329,000 <br />30 <br />Construction Engineering (15%) <br />LS <br />$ <br />6,493,500 1 <br />$ 6,493,500 <br />Engineering Total: <br />$ 10,822,500 <br />Right of Way: <br />31 <br />Right of Way Acquisition <br />LS <br />$ <br />12,460,486 1 <br />$ 12,460,486 <br />Subtotal: <br />$ 12,460,486 <br />25 % Contingency: <br />$ 3,115,122 <br />Right of Way Total: <br />$ 15,575,608 <br />32 <br />Right of Way Consultant Support <br />LS <br />$ <br />1,500,000 1 <br />$ 1,500,000 <br />Total Project Cost (not including PA/ED): <br />$ 71,188,108 <br />