My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRANSPORTATION CORRIDOR AGENCY - FOOTHILL - EASTERN CORRIDOR
Clerk
>
Contracts / Agreements
>
T
>
TRANSPORTATION CORRIDOR AGENCY - TCA
>
TRANSPORTATION CORRIDOR AGENCY - FOOTHILL - EASTERN CORRIDOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2015 2:34:32 PM
Creation date
12/9/2014 1:27:17 PM
Metadata
Fields
Template:
Contracts
Company Name
TRANSPORTATION CORRIDOR AGENCY - FOOTHILL - EASTERN CORRIDOR - JPA
Contract #
A-1986-008
Agency
Public Works
Destruction Year
P
Notes
A-88-063; A-88-100; A-91-044; A-92-025; A-92-061; N-95-091; N-95-034; A-2000-062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
grading, improvements or dedication are completed and <br />accepted by the Agency and funds are available for <br />reimbursement as determined by the Agency. <br />The guidelines for determination of fee credits are as <br />follows: <br />1. General <br />Credit for right -of -way dedication, grading, and other <br />improvements will only be given to the extent that the <br />cost of such right -of -way or improvements are included <br />in the calculation of fees in the Major Thoroughfare <br />and Bridge Fee Program. <br />2. Right -of -Way <br />Credit will be given for right -of -way dedication at <br />the rate of $50,000 per acre adjusted in accordance <br />with the California Construction Cost Index, or <br />comparable index selected by the Board, currently <br />$52,546 per acre, except for slope easements and a <br />120- foot -wide strip along centerline of the <br />transportation corridor which would normally be <br />required for arterial highway dedication. <br />3. Grading <br />Credit will be given for earthwork, road and slope <br />drainage, buttressing, stabilization, hydroseeding and <br />erosion control at the following combined rates: <br />SAN JOAQUIN HILLS TRANSPORTATION CORRIDOR <br />Original /Current <br />Corridor Segment Credit Rate <br />Jamboree to Station 511+50 $149,784/$157,410 per acre <br />road easement <br />Station 511+50 to Moulton Parkway $124,132/130,452 per acre <br />road easement <br />Moulton Parkway to Paseo de Colinas $124,915/131,275 per acre <br />road easement <br />FOOTHILL /EASTERN TRANSPORTATION CORRIDOR <br />Foothill /Eastern Corridor $137,060/$144,038 per acre <br />road easement <br />-33- <br />
The URL can be used to link to this page
Your browser does not support the video tag.