My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRANSPORTATION CORRIDOR AGENCY - SAN JOAQUIN CORRIDOR
Clerk
>
Contracts / Agreements
>
T
>
TRANSPORTATION CORRIDOR AGENCY - TCA
>
TRANSPORTATION CORRIDOR AGENCY - SAN JOAQUIN CORRIDOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 2:54:48 PM
Creation date
12/9/2014 1:57:58 PM
Metadata
Fields
Template:
Contracts
Company Name
TRANSPORTATION CORRIDOR AGENCY - FOOTHILL / EASTERN - JOINT POWERS AGREMEENT
Contract #
A-1986-008
Agency
Clerk of the Council
Destruction Year
P
Notes
A-86-008;
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />NOI', THi..(c:r'ORE, BE IT RESOLVED that as a condition <br />of abpro�•. <br />2 <br />of subdivisions containing within their boundaries <br />portions of <br />3 <br />transportation corridors shown on the Transportation <br />Element of <br />4 <br />County General Plan the developer shall: <br />3 <br />1. Dedicate right- of-way to County. <br />6 <br />2. Grade corridor right-of-way in accordance with <br />schematic <br />7 <br />plans approved:-on.-the tentative nap and rough grading plans appro <br />6 <br />by the Director, 22%. <br />g <br />3. Construct arterial overcrossings for internal <br />arterials. <br />10 <br />Width of ovsrcrossing structure (i.e., number of travel <br />lanes) is <br />11 <br />be determined based upon vehicular and pedestrian traffic <br />generate <br />12 <br />by the proposed project. <br />13 <br />4. Construct corridor travel lanes and interchange <br />ramps <br />14 <br />required immediately for access to proposed development or system <br />J <br />y1 <br />I3 <br />continuity (closure of short gaps). Number of lanes required i <br />s <br />16 <br />based upon traffic generated by proposed project. <br />• =i <br />3, <br />17 <br />S. Participate, Among other designated beneficiaries;.:ia <br />am <br />IS <br />established corridor devel o eit fei program. Co- z x incurr`e' d <br />purs <br />ly <br />to-Conditions 2 through 4 shall be creditable against fees. Costs <br />20 <br />incurred pursuant to Condition 1 shall be creditable against fees <br />21 <br />the extent that the develop_.e =t fee- program includes said right -o: <br />22 <br />cost. <br />23 <br />BE IT FURTHER RESOLVED that EMA is hereby directed to amend <br />24 <br />appropriate sections of the Subdivision and Zoning Codes to impiez <br />23 <br />this policy. <br />26 <br />BE IT FURTHER RESOLVED that EHA is hereby directed to incorpc <br />27 <br />in General Plan amendment elrments, zoning actions, area plans any <br />28 <br />site plans recommendations appropriate for implementing this po1� <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.