Laserfiche WebLink
SJHTC <br />F /ETC <br />TABLE VIII -1 <br />FEE PROGRAM SHARE OF CORRIDOR COST <br />Total Corridor Cost ($) Developers <br />Share ( %) Share ($) <br />Zone A 28.6% $97,856,775 <br />Zone B 19.8% $67,643,330 <br />Total $341,660,000 48.4% $165,500,105 <br />Zone A 25.8% $133,096,099 <br />Zone B 22.7% $117,131,975 <br />Total $516,147,000 48.5% $250,228,066 <br />B. Determination of Base Fee <br />The cost attributable to future development must be reduced to a fee so that it <br />may be apportioned in an equitable manner to specific types of development. <br />Allocation of the cost on the basis of trip end generation by general land use <br />category is proposed, where: <br />cost apportioned to future development in the AOB zone = <br />cost/trip end trip end growth in the AOB zone <br />SJHTC F /ETC <br />Zone A $97,856,774 = $74 /TE $133,096,091 = $80/TE <br />1,321,160 1,665,922 <br />Zone B $67,643,330 = $46/TE $117,131,975 = $43 /TE <br />1,462,093 2,730,730 <br />The data used in computing the average cost per trip end are summarized in <br />Exhibit IX and X. The trip end generation factors used in the calculation were <br />derived from the EMA Trip Generation Rates, shown in Exhibit XI. The <br />projected growth in dwelling units was taken from the respective San Joaquin <br />223512_2.DOC 21 <br />