My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />DESIGN AND CONSTRUCTION SUPPORT OF THE SANTA ANA DELHI DIVERSION PROJECT <br />RFP NO. 14 -069 <br />APPENDIX <br />ATTACHMENT A <br />SCOPE OF WORK <br />GENERAL <br />The City of Santa Ana (The City) is soliciting proposals from professional consulting Firms to provide <br />engineering services for the design and construction support of a diversion project for the Santa Ana <br />Delhi Channel. Engineering services may include civil engineering, electrical engineering, traffic <br />engineering, geotechnical, land /property surveying, structural, architecture, landscaping design, and <br />grant writing services. <br />The City anticipates the design process and award of the construction contract by June of 2016, with <br />construction support needed over two dry seasons in the channel, which establishes three year term <br />period for this agreement. The City may grant up to two one -year extensions, if needed. <br />The work, in general, consists of the design of a diversion structure for the Santa Ana Delhi channel <br />that will mitigate the associated TMDL's for that watershed including the pending TMDL for trash. The <br />design shall include diverting the low flow to the sanitary sewer, a retention basin, and back into the <br />channel. See Appendix Attachment F for the Preliminary Design Report Addendum No. 2 dated August <br />2014. The deliverables shall include the final conceptual design, which will be reviewed and approved <br />by the funding partners; the design; environmental process, all permits, CEQA approval, easement and <br />right -of -way agreements, final construction documents and construction support. <br />The Consultant shall be able to assist the City through this contract to provide the necessary services. <br />The Consultant shall utilize in -house staff and /or sub - Consultants to complete the assignments to meet <br />the City standards. For specialized work for which the prime Consultant shall require a sub - <br />Consultant, the prime Consultant shall serve as an administrative liaison between the City and <br />the sub - Consultant. The prime Consultant mark -up for sub - Consultants shall not exceed 10 %. <br />The proposal and work plan shall be limited to fifteen (15) pages, excluding the twenty (20) pages for <br />the Firms qualifications. A cover letter shall summarize key factors and guarantee that key personnel <br />shall be committed to manage and perform the required tasks throughout the duration of the contract. <br />A schedule of fees and charges described in the following section "Cost and Price" shall be included in <br />the proposal. <br />UZ@1901-11 -N VI&M <br />The Consultant shall perform the above noted engineering design services resulting in contract <br />documents (plans, specifications and cost estimates) and construction support services for the Santa <br />Ana Delhi Diversion Project. The Consultant shall provide a Work Plan which includes a detailed <br />schedule of the project prior to the issuance of Notice to Proceed. Specific Task Orders with Notices to <br />Proceed (NTPs) will be provided for the project at the discretion of the City. Work required per Task <br />City of $q 3o 14 -069 <br />
The URL can be used to link to this page
Your browser does not support the video tag.