4.10Project Schedule — URS will submit monthly project schedule updates and with each final design <br />submittal. The project schedule will reflect coordination items, submittal milestones, critical path <br />items, City and stakeholders review times, shop drawing approvals, manufacturing, delivery, and <br />seasonal weather impacts. URS will prepare the schedule in Microsoft Project (Gantt) format. <br />4.11O12inion of Probable Construction Cost — URS will prepare an engineer's estimate of probable <br />construction costs for the 75 %, 100% and final submittals. URS will incorporate and address <br />comments from the City, related to the cost estimate. Construction costs will be determined from a <br />variety of resources, including: vendor quotes, RS Means Costworks software, Caltrans Cost Data <br />Books, recent construction bids from other similar local projects that URS has recently designed. <br />Final Design Deliverables — URS will provide the following final design deliverables: <br />• Hard copies of construction plans will be reproduced in either full-size (24 "x36 ") bond format <br />or tabloid (11 "x17") bond format, per City's preference. The Construction Specifications will <br />be reproduced in double -sided letter -size format per City standards. The submittals that will be <br />provided are as follows: <br />— URS will submit five (5) hard copies and one (1) electronic file in PDF format of the first <br />(60 %) submittal. Plans for the first submittal will include a draft set of drawings for the <br />entire project. Pipeline alignments, preliminary profiles, existing utilities, street /pipe <br />sections, and details will be provided in detail for of each components of the design such <br />as civil, mechanical, structural, and traffic control components. The first submittal will <br />include all sections of the Construction Specifications with technical specifications and an <br />engineer's estimate of probable construction cost. <br />— URS will submit five (5) hard copies, one (CD) with Auto CAD files for the entire plan set, <br />and one (1) CD with a single full-scale PDF file of the construction plans for the third <br />(100 %) submittal. This subtr ttal will include the complete plan set and specifications and <br />a notebook with the design calculations (including mechanical, civil, structural, pipe <br />thickness and restraint). URS will incorporate City comments on the 60% submittal, as <br />well as comments received at the plan review meeting. URS will update the Specifications <br />and engineer's estimate of probable construction cost for this submittal. <br />— URS will submit wet - sealed and signed reproducible plans (mylars) of the final <br />construction plans and original signed Construction Specifications for the City's <br />signatures. URS will attend a meeting for signatures to explain the project and answer <br />questions. A final engineer's estimate of probable construction cost will be submitted with <br />the final plans and Specifications. <br />4.1213id Support, Addenda Preparation and Pre -Bid Meeting — During the bidding period, URS will <br />provide bidding support and assistance as it pertains to the contract documents and construction <br />drawings. For budgetary purposes, we have assumed a number of hours in out fee estimate to answer <br />questions from prospective bidding contractors, and assist the City in providing information and <br />clarification of the bid documents. URS will consult with the City to address concerns or answer <br />questions in support of administering the bid process. URS has budgeted for up to three (3) addenda <br />to the construction plans and /or Construction Specifications for prospective bidders, if requested by <br />the City. Addenda preparation will include: <br />• Plan Revisions — URS has budgeted eight (8) hours of staff time for plans revisions. <br />• Specification Revisions — URS has budgeted eight (8) hours of staff time for revisions to the <br />Construction Specifications, <br />Im 25P659 <br />