My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO SA-GG FIXED GUIDEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
75A - PH - RESO SA-GG FIXED GUIDEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 4:19:43 PM
Creation date
1/15/2015 4:05:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
1/20/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas that would not encounter undisturbed soils and would therefore not be required to <br />retain an archaeologist shall demonstrate non - disturbance to the City of Santa Ana <br />through the appropriate construction plans, as -built drawings, or geotechnical studies <br />prior to any earth - disturbing activities. Impacts to any significant resources shall be <br />mitigated to a less- than - significant level through data recovery or other methods <br />determined adequate by the archaeologist and that are consistent with the Secretary of <br />the Interior's Standards for Archaeological Documentation. Any identified cultural <br />resources shall be recorded on the appropriate DPR 523 form and filed with the SCCIC. <br />Enforcement Agency: <br />Implementation /Monitoring Agency: <br />Monitoring Phase: <br />Monitoring Frequency: <br />Compliance Action: <br />Geology, Soils, and Seismicity <br />City of Santa Ana <br />Principal Investigator and Archaeological or Native <br />American Monitor /SHPO <br />Construction <br />Ground breaking activities involving undisturbed <br />soil <br />Field Inspection /Monitoring and Maintenance of <br />Log to Demonstrate Compliance <br />No mitigation measures related to geology, soils, and seismicity are required. <br />1CFFkTrromlyiEii1 . M <br />HAZ1 A Phase I Environmental Site Assessment shall be prepared for the following site should <br />O &M Facility Site A be adopted as part of the proposed project: <br />• Madison Materials located at 1035 East 4`h Street <br />A Phase I Environmental Site Assessment shall be prepared for the following sites should <br />O &M Facility Site B be adopted as part of the proposed project: <br />• All Car Auto Parts located at 2002 West 5 "' Street <br />• SA Recycling located at 2006 West 5`" Street <br />• American Auto Wrecking located at 1908 West 51h Street <br />A Phase I Environmental Site Assessment shall be prepared for the following sites should <br />O &M Facility Site A be adopted as part of the proposed project: <br />The assessment shall be prepared by a Registered Environmental Assessor. The <br />assessment shall be prepared in accordance with State standards /guidelines to evaluate <br />whether the site or the surrounding area is contaminated with hazardous substances from <br />the potential past and current uses including storage, transport, generation, and disposal <br />of toxic and hazardous waste or materials. If hazardous materials are identified in the <br />Phase I Environmental Site Assessment, a Phase II Environmental Site Assessment would <br />be completed to identify the extent of contamination and the procedures for remediation. <br />The Phase II Environmental Site Assessment shall be approved by the California <br />Department of Toxic Substances Control. <br />Santa Ana-Garden Grove Fixed Guideway Project REAIFEIR <br />January 2015 <br />75A -53 <br />a g e1 236 <br />
The URL can be used to link to this page
Your browser does not support the video tag.