My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO SA-GG FIXED GUIDEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
75A - PH - RESO SA-GG FIXED GUIDEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 4:19:43 PM
Creation date
1/15/2015 4:05:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
1/20/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enforcement Agency: <br />Implementation /Monitoring Agency <br />Monitoring Phase: <br />Monitoring Frequency: <br />Compliance Action: <br />Air Quality <br />City of Santa Ana <br />Contractor /City of Santa Ana Planning and Building <br />Department <br />Design and Pre - operation <br />Prior to permitting and prior to operation <br />Design Review and Field Verification <br />No mitigation measures related to air quality are required. <br />Hydrology <br />No mitigation measures related to hydrology are required. <br />Safety and Security <br />SAF1 Under Streetcar Alternatives 1 and 2 and the IDS Alternatives, the City of Santa Ana <br />shall coordinate with the Santa Ana Unified School District and Santa Ana Police <br />Department regarding safety at schools adjacent to the alignment. The collaborative <br />effort between the City and interested parties shall develop and teach rail safety <br />measures to students and parents. Other precautionary safety features shall include <br />signs, gated crossing, and crossing and traffic signals to create a safe environment for <br />parents and students during pick -up /drop -off times. <br />Enforcement Agency: City of Santa Ana <br />Implementation /Monitoring Agency: City of Santa Ana /Santa Ana Police Department <br />Monitoring Phase: Design and Pre - Operation <br />Monitoring Frequency: On -going during Construction and Testing <br />Compliance Action: Development of Safety Education Program and <br />Instruction and Field Verification <br />SAF2 The contractor shall install surveillance cameras along the pedestrian walking paths within <br />the PE ROW and at pedestrian gates to adjacent neighborhoods. Police security <br />personnel shall be responsible for surveillance camera monitoring. <br />Enforcement Agency: <br />Implementation /Monitoring Agency <br />Monitoring Phase: <br />Monitoring Frequency: <br />Compliance Action: <br />City of Santa Ana <br />Contractor /City of Santa Ana and Santa Ana Police <br />Department <br />Design and Pre - operation <br />Prior to Operation <br />Field Verification <br />SAF3 The contractor shall install emergency call boxes along the pedestrian walking paths <br />within the PE ROW. <br />Enforcement Agency: City of Santa Ana <br />Implementation /Monitoring Agency: Contractor /City of Santa Ana <br />Monitoring Phase: Design and Pre - operation <br />Monitoring Frequency: Prior to operation <br />Compliance Action: Field Verification <br />Santa Ana - Garden Grove Fixed Guideway Project REAIFEIR P a g ol238 <br />January 2015 <br />75A -55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.