My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO SA-GG FIXED GUIDEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
75A - PH - RESO SA-GG FIXED GUIDEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 4:19:43 PM
Creation date
1/15/2015 4:05:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
1/20/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAF4 The contractor shall design the lighting plan for the pedestrian walking paths within the <br />PE ROW to eliminate shadows or dimly lit areas to the greatest extent feasible. <br />Enforcement Agency: <br />Implementation /Monitoring Agency: <br />Monitoring Phase: <br />Monitoring Frequency: <br />Compliance Action: <br />City of Santa Ana <br />Contractor /City of Santa Ana <br />Design <br />Once prior to design approval <br />Design Review and Field Verification <br />SAF5 Within the PE ROW, the contractor shall fence the track area, and appropriate signage <br />and audible and visual warning devices shall be installed at gate openings. <br />Enforcement Agency: <br />Implementation /Monitoring Agency <br />Monitoring Phase: <br />Monitoring Frequency: <br />Compliance Action: <br />City of Santa Ana <br />Contractor /City of Santa Ana <br />Design and Pre - operation <br />Prior to Operation <br />Field Verification <br />SAF6 If Mitigation Measures SAF2 through SAF4 are considered infeasible, then the Willowick <br />Station shall not be made operational by the contractor until an appropriate public access <br />point from the PE ROW is created as part of the Willowick Golf Course redevelopment. <br />Enforcement Agency: <br />Implementation /Monitoring Agency: <br />Monitoring Phase: <br />Monitoring Frequency: <br />Compliance Action: <br />City of Santa Ana <br />Contractor /City of Santa Ana and Santa Ana Police <br />Department <br />Pre - operation <br />Prior to Operation <br />Field Verification <br />Construction (Air Quality) <br />AQ1 During the construction phase, the contractor shall use Tier 4 or higher off -road <br />construction equipment with higher air pollutant emissions standards. <br />Enforcement Agency: <br />Implementation /Monitoring Agency: <br />Monitoring Phase: <br />Monitoring Frequency: <br />Compliance Action: <br />Cumulative <br />City of Santa Ana <br />Contractor /SCAQMD <br />Construction <br />Monthly <br />Field Verification and Maintenance of Log to <br />Demonstrate Compliance <br />No mitigation measures related to cumulative impacts are required. <br />Santa Ana Garden Grove Fixed Guideway Project REAIFEIR <br />January 2015 <br />75A -56 <br />Paga1239 <br />
The URL can be used to link to this page
Your browser does not support the video tag.