Laserfiche WebLink
This Revised Environmental Assessment /Final Environmental Impact Report (REA /FEIR) complies <br />with both National Environmental Policy Act (NEPA) and California Environmental Quality Act <br />(CEQA) requirements. The federal and State environmental clearance for the Santa Ana - Garden <br />Grove Fixed (SA -GG) Guideway Project (proposed project) was prepared in a joint NEPA and CEQA <br />document. <br />1,1 Intended Use of the Revised EA/Final EIR <br />This REA /FEIR was prepared at the direction and under the supervision of the City of Santa Ana <br />(City) as the local lead agency. The Orange County Transportation Authority (OCTA) is a <br />responsible agency under CEQA. The Federal Transit Administration (FTA) is the federal lead <br />agency pursuant to NEPA. This REA /FEIR incorporates the Environmental Assessment /Draft <br />Environmental Impact Report (EA /DEIR) by reference and includes a description of a subsequent <br />change to the proposed project, which involves the identification of a Locally Preferred <br />Alternative. In addition, the REA /FEIR includes comments and recommendations received in <br />response to the EA /DEIR (either verbatim or in summary); a list of persons, organizations, and <br />public agencies who commented on the EA /DEIR; responses to significant environmental points <br />raised in those comments; and other relevant information added by the local lead agency. <br />The intended use of this REA /FEIR by the City is to assist in making decisions regarding whether <br />to adopt the proposed project, certify the FEIR, and file the Notice of Determination, which will <br />complete the CEQA process. The intended use of this REA /FEIR by FTA is to update the <br />proposed project and provide the necessary information to issue the Findings of No Significant <br />Impact (FONSI) to complete the NEPA process. <br />This REA /FEIR is comprised of four chapters: <br />Chapter 1.0 Introduction. This chapter includes an overview of the proposed project, a summary of <br />the alternatives considered, and a summary of the project's potential environmental impacts. <br />Chapter 2.0 Responses to Comments. This chapter contains comments received by the City <br />during the public review period and public hearings for the EA /DEIR and responses to each <br />comment. <br />Chapter 3.0 Corrections and Additions. This chapter provides the changes to the EA /DEIR in <br />response to comments received during the public review period and public hearing process. <br />Chapter 4.0 Mitigation Monitoring and Reporting Program. This chapter includes a list of the <br />required mitigation measures and identifies the enforcement agency, monitoring agency, <br />monitoring phase, monitoring frequency, and the action indicating compliance with each <br />measure. <br />Santa Ana-Garden Grove Fixed Guideway Project REAIFEIR P a g ell <br />January 2015 <br />75A -59 <br />