Laserfiche WebLink
1.2 Summary of the Proposed Project <br />The SA -GG Fixed Guideway Project proposes to provide a new east -west transit line in Orange <br />County between the Santa Ana Regional Transit Center (SARTC) in the City of Santa Ana and <br />the Harbor Boulevard /Westminster Avenue intersection in the City of Garden Grove. The <br />purpose of the SA -GG Fixed Guideway Project is to: <br />• Improve Transit Connectivity within the Study Area; <br />• Relieve Congestion by Providing Alternative Mobility Options; <br />• Be Sensitive to the Character of the Community; <br />• Increase Transit Options; <br />• Improve Transit Accessibility to and within the Study Area; and <br />• Provide Benefits to the Environment through Improved Air Quality. <br />The alternatives addressed in the EA /DEIR consisted of a No Build Alternative and a <br />Transportation System Management (TSM) Alternative, as well as four build alternatives; <br />Streetcar Alternatives 1 and 2 and Initial Operating Segment (IOS) -1 and IOS -2, which are <br />shorter versions of the full alignment. Streetcar Alternative 1, which is the Locally Preferred <br />Alternative, will utilize the Pacific Electric Right -of -Way (PE ROW) through the western portion of <br />the approximately four -mile alignment to reduce costs and impacts and to provide optimum <br />accessibility. The eastern portion of the alignment will operate along Santa Ana Boulevard and <br />4 "' Street on the way to SARTC. The streetcar system will be electrically powered using an <br />overhead contact system and a series of Traction Power Substations. The Locally Preferred <br />Alternative includes 24 stations. <br />Streetcar Alternative 2 would utilize the PE ROW through the western half of its alignment and <br />primarily operate along Santa Ana Boulevard, Civic Center Drive, and 51" Street through the <br />eastern half of the alignment to SARTC. The operational characteristics of this alternative are <br />identical to Streetcar Alternative 1. The differences between the two streetcar alternatives are <br />the alignment and the fact that Streetcar Alternative 2 would have one additional station for a <br />total of 13. <br />The No Build Alternative provides the basis for comparing future conditions resulting from other <br />alternatives. This alternative includes conditions in the foreseeable future (through planning <br />horizon year 2035) include projects that (1) have environmental analysis approved by an <br />implementing agency and (2) have a funding source identified for implementation. The TSM <br />Alternative enhances the mobility of existing transportation facilities and transit network without <br />construction of major new transportation facilities or significant, costly physical capacity <br />improvements. The TSM Alternative emphasizes low cost (i.e., small physical) improvements <br />and operational efficiencies, such as focused traffic engineering actions, expanded bus service, <br />and improved access to transit services. In response to funding and phasing issues raised by <br />fiscal constraints identified during OCTA's long -range transportation planning process, IOSs <br />were developed as alternatives, which are shorter segments of the Locally Preferred Alternative <br />and Streetcar Alternative 2. Further details on these alternatives are provided on page 2 -1 of <br />the EA /DEIR. <br />Santa Ana Garden Grove Fixed Guideway Project REAIFEIR <br />January 2015 <br />75A -60 <br />Page12 <br />