My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - OCWD ASSESSMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
25I - AGMT - OCWD ASSESSMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 4:39:07 PM
Creation date
1/15/2015 4:33:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
1/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PVC /DI Pipe Cost Per Linear Foot Calculation <br />PVC Pipe Cost Per Linear Foot <br />Size /inches) 1 1 16 <br />Installation <br />$ <br />40 <br />Provide cost data <br />PVC <br />$ <br />30 <br />25% <br />Additional - Restrained Joints <br />$ <br />- <br />$ <br />4 <br />$ <br />- <br />Pipe Zone (Sand) <br />$ <br />2 <br />$ <br />5 <br />$ <br />2 <br />Pavement Repair <br />$ <br />53 <br />$ <br />75 <br />$ <br />53 <br />Backfill with on -site soil <br />$ <br />20 <br />cy <br />< -- -Enter Value <br />Trucking (transportation) <br />$ <br />Installed Pipe Cost ($ /If) <br />Option - Slurry Backfill <br />$ <br />55 <br />$ <br />154 <br />$ <br />55 <br />Slurry Backfill Add <br />$ <br />29 <br />$ <br />57.28 <br />$ <br />29 <br />Installed Pipe Cost ($ /If) <br />Option - Imported Backfill <br />$ <br />84 <br />$ <br />211 <br />$ <br />84 <br />Imported Backfill Add <br />$ <br />11 <br />$ <br />22 <br />$ <br />11 <br />Installed Pipe Cost ($ /If) <br />$ <br />66 <br />$ <br />176 <br />$ <br />66 <br />Enter the following data <br />< -- -Enter Pipe Sizes <br />< -- -Enter Installation Cost from PVC -DI <br />Equipment and Manpower Spreadsheet <br /><.. -Enter Pipe Cost <br />Avg depth to top of pipeline <br />5 feet < ... Enter Value <br />Provide cost data <br />% of Pipe Length - Restrained <br />25% <br />< ... Enter Value <br />Sand <br />$ <br />16 <br />ton <br /><-- -Enter Value <br />Pavement <br />$ <br />16 <br />sf <br /><-- -Enter Value <br />Slurry <br />$ <br />125 <br />cy <br /><-- -Enter Value <br />Imported Backfill <br />$ <br />20 <br />cy <br /><-- -Enter Value <br />Haul Off (loading, disposal fee) <br />$ <br />20 <br />cy <br />< -- -Enter Value <br />Trucking (transportation) <br />$ <br />15 <br />cy <br />< -- -Enter Value <br />Assumptions: <br />Pipe zone equals 4- inches of bedding below the pipe, 8- inches on either side of the pipe and 12- inches above the F <br />Trench width equals pipe diameter plus 8- inches either side <br />Pavement Repair is trench width plus 24 -inchs (t -cut repair, 12- inches on each side of the trench) <br />Pavement Structural Section 12 "AC <br />Restrained pipe is assumed to be about 1.5 times more than straight pipe. <br />Installed price does not include pipe appurtenances (valves, air /vacs, blow -offs, etc) <br />Material price needs to include Contractor mark -up for profit as well as shipping and tax <br />251 -76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.