Laserfiche WebLink
Alternative 2 - Garthe Reservoir Pipeline <br />16" Well 32 Transmission Line <br />Construction Cost Estimate <br />Item , <br />Quantity <br />Unit Description, <br />Unit <br />Total - <br />Cost <br />Cos{ <br />3250 LF Construct 16" PVC Pipeline $200 $650,000 <br />200 LF Bore and Jack (30" steel casing) $1,500 $300,000 <br />Valves and Appurtenances (Assume 4% of Pipeline $26,000 $26,000 <br />LS Cost) <br />1 EA Connection at Well 32 $5,000 $5,000 <br />1 EA Connection at Garthe $5,000 $5,000 <br />38000 SF Pavement Slurry Seal (Half of Memory Lane) $0.50 $19,000 <br />1 LS Prepare and Set -up Traffic Control $70,000 $70,000 <br />LS Sheeting, Shoring and Bracing $10,000 $10,000 <br />LS Mobilization, Demobilization, and Cleanup $60,000 $60,000 <br />Subtotal: $1,145,000 <br />Contingency (30 %): $343,500 <br />Total: $1,488,500 <br />Construction Cost Estimate ; 1,489,000 <br />CITY OF SANTA ANA <br />251 -75 <br />TETRA TECH, INC. <br />