My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORKSTUDY-A_MAPP STAFFING STUDY - RESULTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
WORKSTUDY-A_MAPP STAFFING STUDY - RESULTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2015 11:42:01 AM
Creation date
1/28/2015 4:41:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Date
1/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Visibility Variables <br /> <br />Performance objective - Visibility objective (hours), highway/arterial roadways 4 <br />Performance objective - Visibility objective (hours), collector/residential <br />36 <br />roadways <br />Number of miles, highway/arterial roadways 62.25 <br />Number of miles, collector/residential roadways 434.16 <br />Average patrol speed (mph) 16.2 <br /> <br />Weights for Performance Objectives <br /> <br />Response time goal for Priority 1 calls objective weight (percentage) 35 <br /> <br />Patrol visibility objective weight (percentage) 20 <br />Response time goal for Priority 2 calls objective weight (percentage) 20 <br />Response time goal for Priority 3 calls objective weight (percentage) 20 <br />Immediate availability objective weight (percentage) 5 <br />Leave Percentage <br /> <br /> <br />Average Percentage of Time On Leave 23.59 <br />Additional Variable <br /> <br />Percentage of time patrol units staffed with two officers 2 <br />Number of Patrol Officers Current: 142 Projected: 186 <br /> Differential: +44 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.