My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PAULUS ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PAULUS ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:15:16 PM
Creation date
2/9/2015 8:20:52 AM
Metadata
Fields
Template:
Contracts
Company Name
PAULUS ENGINEERING, INC.
Contract #
11-6416
Agency
Public Works
Council Approval Date
12/2/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />DECEMBER 2, 2014 <br />TITLE: <br />AWARD CONTRACT FOR 17TH <br />WATER MAIN IMPROVEMENTS: <br />STREET TO BROADWAY <br />(PROJECT 116416) <br />(STRATEGIC PLAN NO. 6, 1, B) <br />CITY WANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED DEC 2 2014 <br />STREET Li As Recommended) o?,A <br />BRISTOL <br />E] As Amended <br />❑ Ordinance on 1" Reading <br />❑ Ordinance on 2 n Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />Award a contract to Paulus Engineering, Inc., the lowest responsible bidder, for the <br />construction of the 17th Street Water Main Improvements, Bristol Street to Broadway, in <br />accordance with the base bid in the amount of $1,593,540 and a contingency of $239,031 for <br />total amount not to exceed $1,832,571. <br />2. Approve the Cost Analysis for a total estimated project delivery cost of $2,071,602. <br />DISCUSSION <br />The existing 10 -inch diameter cast iron water main on 17th Street was installed in the 1930's and <br />has begun to experience a number of breaks and leaks. Staff monitors the condition of water main <br />pipelines by assessing critical factors such as age, history of breaks, size, location, and system <br />redundancy to determine the priority of replacement needs. Based on an analysis of these factors, <br />the water main on 17th Street between Bristol Street and Broadway has been identified as the <br />highest priority for replacement due to its high probability of failure and significant consequences <br />should a failure occur. <br />Prior to advertising the project for bids, staff considered the impacts of construction on businesses <br />and regional traffic. A vicinity map in Exhibit 1 shows the relative location of the water main on 17th <br />Street to other major city streets. As a result, the project scope was developed to include the <br />option and flexibility to perform construction during nighttime hours as a base bid, along with the <br />option to perform the work during standard daytime hours. <br />Staff recommends that the contract be awarded based on nighttime work. If nighttime work is <br />performed, all vehicle travel lanes would be open during the daytime, allowing access to <br />businesses, and would not interfere with critical peak morning and evening commutes. Working <br />hours for the construction would be 7:00 p.m. to 5:00 a.m. Nighttime construction would adhere to <br />the City's noise ordinance at all times; nonetheless, staff will require that noisier construction <br />activities be limited to before 10:00 p.m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.