Laserfiche WebLink
The contractor shall be an independent contractor capable of providing experienced, <br />knowledgeable and professional staff. The contractor shall be responsive and maintain excellent <br />working relationships with city residents, businesses, government officials and City staff. The <br />contractor shall provide adequate staffing levels at all times and adhere to established schedules. <br />The contractor shall comply with all federal, state and local laws, rules, regulations, ordinances, and <br />statutes. <br />V. GENERAL INFORMATION <br />VI. <br />A. The term of the contract will begin after the contract award by the City Council and approval <br />of required bonds. <br />B. When determined appropriate, the City will provide information in its possession relevant to <br />preparation of required information in RFP. The City will provide only the staff assistance <br />and documentation specifically referred to herein. <br />C. The proposer shall be responsible for retaining data, records and documentation for the <br />preparation of the required information. These materials shall be made available to the City <br />as requested by the City. <br />D. This RFP does not commit the City to pay costs incurred in preparation of a response to this <br />RFP. All costs incurred in the preparation of the proposal, the submission of additional <br />information, attendance at preproposal conference, negotiations with City, and /or any other <br />aspect of a proposal prior to award of a written contract will be borne by the proposer. The <br />City reserves the right to accept or reject the combined or separate components of this <br />proposal in part or in its entirety or to waive any informality or technical defect in the <br />proposal. <br />E. All data, documents and other products used, developed, or produced during response <br />preparation of the RFP will become property of the City. All responses to the RFP shall <br />become property of the City. Proposer information identified as proprietary information shall <br />be maintained confidential, to the extent allowed under the California Public Records Act. <br />The City reserves the right to reject, replace and approve any and all subcontractors. All <br />subcontractor(s) shall be identified in the response to the RFP and the City reserves the <br />right to reject any subcontractor(s). Subcontractors shall be the responsibility of the prime <br />contractor and the City shall assume no liability of such subcontractors. <br />Coordination by the awarded proposer with the City, other contractors, and agencies will be <br />required to achieve satisfactory and timely delivery of the required services. Coordination may <br />include, but not be limited to, coordination with neighborhood and civic groups, local and /or state <br />agency boards, and attendance at City Commission, Agency, and Council meetings,. <br />The City will decide the manner in which the coordination efforts with be conducted. At the City's <br />option, coordination efforts may be performed by the proposer's direct contact, by the proposer <br />acting through the City or by the City. When coordination efforts require agreements, such <br />agreements shall be coordinated through the City. <br />VII. PROPOSER RESPONSIBILITIES <br />The selected proposer will assume responsibilities for all services in its proposal. The selected <br />proposer shall identify a sole point of contact with the greatest knowledge in regard to the required <br />service operations and contractual matters, including payment of any and all charges resulting from <br />the Agreement. <br />RFP FOR LED POST TOP RETROFIT STREETLIGHTS & SARTC STRUCTURE LIGHTING Page 15 <br />