My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO - WATER RATES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
02/17/2015
>
75A - PH - RESO - WATER RATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2015 5:35:38 PM
Creation date
2/12/2015 5:23:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
2/17/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />DECEMBER 2, 2014 <br />TITLE: <br />AUTHORIZE STAFF TO PREPARE <br />DOCUMENTS FOR PROPOSED WATER <br />AND SEWER RATE ADJUSTMENTS <br />(STRATEGIC PLAN NO. 6,1, H) <br />CITY MANA4 <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />® As Amended <br />CJ Ordinance on 1" Reading <br />1771 Ordinance on 2nd Reading <br />Implementing Resolution <br />Set Public Heating For <br />CONTINUED TO <br />FILE NUMBER <br />Authorize and direct staff to prepare all required documents necessary to proceed with notification <br />of proposed water and sewer rate adjustments in compliance with Proposition 218 requirements, <br />including, but not limited to, all of the following: <br />a) Prepare and mail proposed rate adjustment notices to all Santa Ana property owners in <br />compliance with Proposition 218 requirements; <br />b) Schedule a public hearing at a future Council meeting; <br />c) Prepare all other documents required to proceed with water and sewer rate adjustments. <br />DISCUSSION <br />Background <br />The City owns and operates a water system and a sewer collection system that provides services <br />to a population of over 330,000, The City water system currently consists of 500 miles of mains, <br />10 reservoirs, 7 pumping stations, and 19 active wells. The City sewer system consists of 390 <br />miles of main, 19 miles of Orange County Sanitation District (OCSD) lines (some of which are <br />maintained by the City), 8,000 manholes, and 2 lift stations. <br />In June 2011, the City Council directed staff to perform a comprehensive examination of City <br />assets, capital needs, and financial condition of both the water and sanitary sewer enterprises. At <br />that time, the most recent rate study had been performed in 1995. On October 3, 2011, upon <br />completion of a competitive bid process, the City awarded a contract to Black & Veatch <br />Corporation (B &V) to perform the comprehensive analysis and develop a financial plan to address <br />the City's long -term water and sewer Infrastructure needs, <br />66613-1 <br />7 '16k5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.