Laserfiche WebLink
(3) The Proposer shall exhibit, by portfolio and references, the capacity to respond to <br />emergency tree incidents, ranging from limb failures on single trees to storm <br />related damages affecting many trees, in a manner that meets the needs of the <br />City. <br />D. WORKING HOURS <br />(1) Normal working hours shall be within a ten -hour day between the hours of 7:00 <br />AM and 5:00 PM, Monday through Friday. No Saturday or Sunday work is to be <br />scheduled without prior written permission from the City, unless it is an <br />emergency situation. No motorized equipment shall be operated before 8:00 AM <br />or after 5:00 PM. <br />Normal business hours are according to the Municipal Code, Section 18- <br />314.(i) — Special provisions. <br />2. (I) Noise sources associated with the maintenance of real property, <br />provided said activities take place between 7:00 a.m. and 8:00 p.m. on <br />any day except Sunday or a federal holiday, or between the hours of <br />9:00 a.m. and 8:00 p.m. on Sunday or a federal holiday. <br />E. LEVEL OF MAINTENANCE <br />(1) All work shall be performed in accordance with the HIGHEST INDUSTRY <br />STANDARDS, as stated in the enclosed maintenance specification description. <br />Standards and frequencies may be modified from time to time as deemed <br />necessary by the City for the proper maintenance of the sites. <br />(2) If, in the judgment of the City, the level of maintenance is less than that specified <br />herein, the City shall, at its option, in addition to or in lieu of other remedies <br />provided herein, withhold appropriate payment from the Contractor until services <br />are rendered in accordance with specifications set forth within this document and <br />providing no other arrangements have been made between the Contractor and <br />the City. Failure to notify of a change and /or failure to perform an item or work <br />on a scheduled day may, at the City's sole discretion, result in deduction of <br />payment for that date, week, or month. Payment will be retained for work not <br />performed until such time as the work is performed to City standard. <br />(3) The Contractor is required to correct deficiencies within the time specified by the <br />City. If noted deficient work has not been completed, payment for subject <br />deficiency shall be withheld for current billing period and shall continue to be <br />withheld until deficiency is corrected, without right to retroactive payments. <br />QUALITY OF WORK AND MATERIALS <br />(1) All material and equipment furnished by the Contractor shall be new, high grade, <br />and free from defects and imperfections, unless otherwise hereinafter specified. <br />Workmanship shall be in accord with the best standard practices. Both materials <br />and workmanship shall be subject to the approval of the Project Manager or <br />designee. All materials used shall be approved in advance by the Projects <br />Manager or designee. <br />City of Santa Ana Street Tree Maintenance RFP <br />Page 15 <br />19E-18 <br />