My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - EIR - BRISTOL FROM CIVIC CENTER TO WASHINGTON
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75B - PH - EIR - BRISTOL FROM CIVIC CENTER TO WASHINGTON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2015 12:48:06 PM
Creation date
4/2/2015 4:03:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
922
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />The provisions of far -side bus turnouts at major intersections, as recommended, <br />would enhance through travel by removing stopped buses from the through traffic <br />lane. <br />Pedestrian circulation would be significantly improved and made safer, through <br />installation of ten -foot wide sidewalks along both sides of the street (currently, <br />sidewalks do not exist uniformly throughout the corridor and are missing in some <br />spots ). Continuous sidewalks will also improve pedestrian access to and from the <br />bus stops along Bristol Street. The proposed project would also include an <br />upgraded street lighting system, which will improve lighting levels and everting <br />visibility for both pedestrians and motorists. _ <br />5. Removal of old, unsafe structures and non - conforming uses. <br />Acquisition of needed right -of -way and widening of the roadway and major <br />intersections would require the removal of several old structures, including fences, <br />walls and buildings, which may be unsafe at present due to their age and _ <br />deteriorated conditions. The removal of these structures, along with other sound <br />structures which contain or support non - conforming uses, would enhance the <br />potential for implementations of the City's General Plan and Zoning Ordinance _ <br />objectives for this area. <br />Adverse Impacts that would accompany construction and completion of the proposed _ <br />street improvements include the following: <br />A. Air Quality _ <br />Short -term increases in local emissions would occur during construction of the <br />proposed improvements, which could be considered a nuisance by local residents, <br />pedestrians, shoppers, etc. who are present during construction operations. Such <br />emissions would involve exhaust from construction equipment, fugitive dust from <br />grading activities and vehicular exhaust from motor vehicles of the construction <br />crew and the vehicles used to transport the construction equipment. <br />Long -term increases in emissions of nitrogen dioxides would occur because of <br />improved traffic flow and higher operating speeds. <br />B. Noise <br />Short -term increases in local noise levels would occur during construction of the <br />proposed improvements, which could be perceived as nuisance noise by residents, <br />pedestrians, shoppers, etc. during construction operations. <br />A widened roadway will result in a wider dispersion of traffic noise along the <br />roadway, potentially resulting in noise level increases in excess of federal and <br />-vi- <br />75B -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.