My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the local businesses and residents located along Bristol Street and <br />adjacent development on nearby cross streets. <br />Sewers <br />Sewer lines carrying sewage flows from north to south edst at various <br />depths beneath Bristol Street for the entire length of the project area <br />and beyond. The sewer lines are large (ranging from 18" to 24" in <br />diameter), and no deficiencies in capacity exist nor are anticipated in <br />the near future. The various segments of sewer litre beneath the street <br />are under a combination of ownership by either the City of Santa Ana <br />or the Orange County Sanitation District. From Memory Lane south to <br />Santa Clara Avenue, the sewer line is an 18" vitreous clay pipe (VCP) <br />owned by the City of Santa Ana. Between Santa Clara Avenue and <br />Myrtle Street, the sewer line is owned by OCSD and consists of VCP <br />which enlarges in diameter from 18" to 21" to 24" as the line proceeds <br />south. From Myrtle Street south to Warner Avenue, the sewer line <br />under Bristol Street again comes under City ownership and steps down <br />in size. .South of Myrtle the sewer line is 14" in diameter enlarging in <br />size to 16 ", 21 ", and eventually 24" by the time the line reacbes Warner <br />Avenue. There is also a small 6" diameter line which serves the <br />properties on the east side of Bristol Street between St. Gertrude Place <br />and Warner Avenue. Upon leaving the project area, the sewer line <br />continues south beneath Bristol Street, merging with other lines and <br />incrementally increasing in size. <br />Sewage from this line is directed to a larger line which carries flows <br />west beneath Alton Avenue, eventually exiting the City and carrying <br />sewage downstream for treatment. In addition to the sewer line which <br />runs along Bristol Street for the length of the project area, there are <br />several east -west lines which cross beneath Bristol Street at numerous <br />laterals which serve the properties fronting upon the street. <br />Water <br />Water mains run beneath Bristol Street for the entire length of the <br />project area. These are generally 12" diameter lines with the exception <br />of a 1p" line which runs between Memory Lane and Santa Clara <br />Avenue, and two 4" lines which run between 17th Street and Civic <br />Center Drive and between First Street and McFadden Avenue. Larger <br />mains (12" diameter) run adjacent to the 4" lines for most of the <br />segment lengths served by the smaller lines, resulting in duai lines <br />beneath these street segments. There are also numerous laterals to <br />provide service to properties along Bristol Street and various east -west <br />mains which cross beneath the street. The water lines in the area are <br />presently considered adequate with no known problems. In addition, a <br />Metropolitan Water District transmission line, ranging in size from 33% <br />36" in diameter, runs beneath Bristol Street for the entire length of the <br />III -59 <br />75C -130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.