My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1452 Edinger PACIFICBSELL <br />cae r. Ca.dorma 92690 <br />April 17, 1987 <br />Willdan & Associates ~ <br />12900 Crossroads Parkway South <br />Suite 200 <br />Industry, California 91746 - 3499 <br />Attentions Mr. Carl Morgan <br />Re: Preliminary planning for Bristol Street widening between <br />Memory Lane S Warner Avenue. <br />Dear Mr. Morgan: <br />This letter is in response to your request for <br />regarding location of our existing telephone plant <br />with this future street widening project. Attached <br />notes: one for aerial plant and one for underground <br />These should give you a general idea of the extent of <br />plant facilities in the area. <br />information <br />associated r <br />are my field <br />facilities. -' <br />our outside <br />In response to your question about procedures and regulations for <br />street widening projects, there really are hone. The City of wn <br />Santa Ana will send us a copy of their street widening plans <br />which show what facilities have to be relocated. Engineering <br />will design a work order to relocate our plant as needed in <br />conjunction with the power and CATV companies. Our construction <br />forces will perform the work. Generally no billing takes place .� <br />unless the city declares an undergraunding district. <br />If you have any questions please call me an (714) 259 -4484. <br />Sincerely, <br />Bob Hecker <br />Engineer .. <br />Enclosures: 2 <br />75C -309 <br />I% -38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.