My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol right -of -way and 50 feet from the First Street right -of- <br />way. The CANO Headstart State Preschool lies 250 feet north of <br />the First Street centerline with the playground at the Bristol <br />right -of -way. The closest SFD to this intersection lies 380 feet <br />south of the First Street centerline at 10 feet from the Bristol <br />right -of -way. <br />At the Bristol /Warner intersection, the closest sensitive recep- <br />tors are residential land Uses. One SFD lies 200 feet east of <br />the Bristol Street centerline adjacent to the Warner Avenue <br />right -of -way. A second SFD lies 500 feet north of the Warner <br />Avenue centerline at 2205 Bristol Street. The Bristol Place <br />multifamily apartment complex lies "00 feet west of the Bristol <br />Street centerline on Warner Avenue. <br />The Caline 3 modelling shows a substantial decrease in the 1 -hour <br />and 8-hour average carbon monoxide concentrations at all recep- <br />tors at the intersections analyzed as a result of the roadway <br />widening proposed. The carbon monoxide concentrations with the <br />project are lower than those with the No Project Alternative <br />because the benefits of increased speeds mire than offset the <br />detrimental effects of a wider cross - section. <br />Currently, the background 1 -hour carbon monoxide concentration <br />(18.0 ppm) is below the state and federal standards. However, <br />the 8 -hour average background concentration (11.7 ppm) presently <br />exceeds both state and federal standards. Year 2006 1 -hour <br />background concentrations (14.6 ppm) are projected to be well <br />below the relevant state and federal standards. Ambient 8-bour <br />CO levels in the year 2006 (9.5 ppm) are expected to exceed both <br />state and federal standards (9.0 ppm; see Appendix for methodolo- <br />gy). <br />At present, sensitive receptors in the project vicinity appear to <br />experience carbon monoxide levels that exceed state and federal <br />standards. _.Under future conditions with the project, sensitive <br />land uses adjacent to the intersections analyzed will be setback <br />far enough from the intersections to allow dispersion of pollu- <br />tants and significantly reduce the number of receptors exposed to <br />high concentrations of carbon monoxide. Since only "worst case" <br />conditions were considered in Table 3 -4, carbon monoxide concen- <br />trations during conditions which are more likely to occur should <br />be less than those shown. <br />rAir Quality Management Plan <br />The 1982 Revision of the Final AQMP includes projections of <br />future carbon monoxide levels in the South Coast Air Basin. The <br />second highest 8 -hour average forecast is 9.5 ppm by the year <br />2000. Based upon these projections (which assume that the AQMP <br />1. The higher speeds resulting from more efficient traffic <br />3 -12 <br />75C -452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.