My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
attainment strategies are implemented), future background conc <br />trations should be low enough to reduce the number of days <br />ceeding the 8 -hour standard, in the project vicinity. <br />The AQMP assumes a level of growth in population and employm r. <br />consistent with the SCAG -82 forecast (based on a local juriso..Z_ <br />tion's General Plan). The project proposal is consistent w t') <br />the Circulation Element of the General Plan for Santa Ana, there- <br />fore, the project appears to be consistent with the AQMP. Mo:^- <br />over, the project will not adversely impact regional ambient it <br />quality. It will improve several circulation performance chary= - <br />teristics which are instrumental in determining vehicle emiss -3r <br />rates and thus air pollutant emissions. <br />On November 3, 1987, the Ninth Circuit Court of Appeals issued <br />opinion vacating and ordering disapproval of Environmen _ <br />Protection Agency's (EPAs) previous approval of ozone and cari <br />monoxide (CO) control measures for the South Coast Air Bae <br />(SCAB). The State Implementation Plan (SIP) for ozone and CO <br />SCAB was disapproved by EPA on January 22, 1988. This project <br />in an area where there is not an approved SIP current <br />containing any enforceable Transportation Control Measures (TCM-) <br />for ozone and CO. Therefore, the conformity procedures of 23 C <br />77o do not apply to this project. A SIP revision has be <br />developed for this area by the local air quality a; <br />transportation planning agencies, but that STP revision has n <br />been approved by EPA. The mobile emission analysis of the area <br />air quality management plan, included in the proposed S <br />revision is based on a Regional Transportation Plan (and Progra <br />that includes this project. Therefore, it is expected that if <br />SIP revision is approved for the project area, that this projec <br />would conform to it. <br />3 -13 <br />75C -453 <br />
The URL can be used to link to this page
Your browser does not support the video tag.