My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 Air Quality Mitigation Measures <br />Measures selected for incorporation in the project include: <br />1. SCAQMD Rule 403 (see page 10 of the Appendix) will be ad- <br />tiered to, insuring the clean up of construction - related dirt <br />on approach routes to the site. <br />2. Adequate watering techniques will be employed to partially <br />mitigate the impact of construction - generated dust particu- <br />lates. <br />3. Construction equipment will be properly maintained and ser- <br />viced to minimize exhaust emissions. <br />4. Consideration will be given to the provision of convenient <br />bus shelters and bus turnouts along Bristol Street to encou- <br />rage the use of public transportation. <br />Additional mitigation measures offered for consideration and <br />incorporation in the project if found to be feasible: <br />5. The use of energy efficient lighting along Bristol Street <br />(low pressure sodium vapor lights) should be considered to <br />reduce emissions at the power plant serving the area. (AQMP <br />control measure N11) <br />5. Traffic signals along Bristol Street should be synchronized <br />if feasible. (AQMP control measure K2) <br />7. Construction activities should be halted during Stage One <br />and Stage Two smog alerts. <br />756454 <br />
The URL can be used to link to this page
Your browser does not support the video tag.