My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - BRISTOL ST SIGNAL SYNC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/21/2015
>
20A - AA - BRISTOL ST SIGNAL SYNC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2015 5:10:25 PM
Creation date
4/16/2015 4:23:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
4/21/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />COOPERATIVE AGREEMENT NO. C- 4.1882 <br />BRISTOL STREET — TSSP <br />classification counts. <br />D. To develop and implement raw timing plans optimized for signal synchronization. <br />E. To provide updated timing plans 'for all control systems and all relevant data used to <br />develop said plans to the PARTICIPATING AGENCIES. <br />F. To prepare a "Before and After Study" for the PROJECT as described in the Measure <br />M2 Eligibility Guidelines adopted by the AUTHORITY. The 'Before and After Study" for the project is <br />considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />B.111.9) for the PROJECT. The AUTHORITY shall provide the 'Before and After Study" to the <br />PARTICIPATING AGENCIES in draft and final formats for review and comment. AGENCY comments <br />shall be noted in the final study. If specified in original PROJECT APPLICATION, the AUTHORITY <br />shall provide a "Before and After Study" video of a representative portion of PROJECT. <br />ARTICLES. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES: <br />The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br />and funding of the PROJECT: <br />A. Provide a technical representative to meet and participate as a member of the <br />PROJECT's Traffic Forum. <br />B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br />PROJECT. <br />C. To participate and support the PROJECT implementation within the timeframe <br />outlined in the APPLICATION and consistent with the CTFP Guidelines adopted by the <br />AUTHORITY. <br />D. To provide the AUTHORITY all current intersection, local field master, and /or ATMS <br />timing plans and related data upon request. <br />E. To provide the local cash match and /or documentation for the in-kind services match <br />for the PROJECT in accordance with Attachment A. Failure to provide included local cash match <br />and /or evidence of in -kind services match may result in the loss of future participation for competitive <br />Page 6 of 14 <br />20A -8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.