My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/21/2015
>
25C - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2015 5:12:00 PM
Creation date
4/16/2015 5:07:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
4/21/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant shall prepare necessary PS &E, procure and Implement the <br />Improvements. Cost shall not exceed the budget of $100,000 plus 10% <br />contingency. <br />b. BluFax <br />Consultant shall procure and Install BluFax field units at 3 locations as <br />shown In Atta4 Gant -3; Exhibit 2 � Appendix B <br />Consultant shall have the Implementation of the Blufax units completed <br />and Integrated Into Santa Ana's existing BluFax system prior to performing <br />any'Before' study. <br />c. IP Communication <br />Consultant shall procure and install all IP communication equipment (I.e. <br />Ethernet and fiber optic switches) as shown In the Exhibit 2 - Appendix B. <br />If necessary due to budget constraint, Santa Ana can assist In Installing <br />and programming the equipment; consultant must provide detail costs and <br />state such request in the proposal. <br />3. City of Fountain Valley <br />No system procurement and Integration, <br />4. City of Costa Mesa <br />a. TMC <br />Consultant will work with Costa Mesa staff to determine the needs of the <br />City to upgrade Its Traffic Signal System or Video Management and <br />Display Systems and related Improvements. Consultant shall prepare <br />PS &E if necessary, procure and implement the system. Cost is not to <br />exceed the budget of $50,000 plus 10% contingency, <br />b. IP Communication <br />Consultant shall procure and install all IP communication equipment (Le. <br />Ethernet and fiber optic switches) as shown In the Exhibit 2 - Appendix B <br />c. Traffic signal controllers replacement <br />Consultant shall procure and install ASC3 traffic signal controller as shown <br />In the Exhibit 2 - Appendix B. <br />IV, Task 4 Construction Management <br />Once the Improvements contracts ara awarded to construction contractors, Consultant <br />shall provide engineering, coordination and documentation support with the contractor as <br />necessary to ensure proper and complete implementation of the project improvements. In <br />addition, ConsulianP shall provide the following services,. <br />A. City of Garden Grove <br />Consultant, as representative for Santa Ana Construction Engineering, shall coordinate <br />with the contractor and oversee all the improvements within City of Garden Grove. <br />However, all construction inspo0on services will be provided by City of Garden Grove, <br />B. City of Santa Ana <br />Santa Ana staff will provide all construction management and inspection services for <br />improvements within Santa Ana, <br />25C -19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.