Laserfiche WebLink
10 <br />25C -34 <br />Install Conduit & <br />-- <br />Fiber, Ethernet <br />Costa Mesa <br />Law Court <br />Communication <br />Cabinet Upgrade, <br />$q 1,500 <br />I <br />$1,700 <br />$41,500 <br />543,200 <br />58,640 <br />$0 <br />Battery Backup, <br />EVP <br />hetall Conduit & <br />Costa Mesa <br />South Coast Or <br />Fiber, CCTV <br />Cnmora System, <br />$24,800 <br />1 <br />$1,100 <br />$24,800 <br />$25,900 <br />55,180 <br />$0 <br />EVP, Ped Upgrade <br />Caltmns <br />1405 NE Off <br />Controller Upgrade, <br />Ram r <br />GPS Unit <br />Caltmns <br />µ1 -405 SE OU <br />Controller Upgrade <br />_ <br />Rem <br />Install Conduit & <br />Costa 4lesa <br />Gisler Ave <br />Fiber, CCTV <br />$23,600 <br />I <br />$1,000 <br />$29,600 <br />$24,600 <br />$4,920 <br />$0 <br />Camera System, <br />__ <br />EVP, Yed 0 grade <br />Costa Mesa <br />Date Pl <br />CCTV Camera <br />System, EVP <br />$16,500 <br />1 <br />$700 <br />$16,500 <br />_ <br />517,200 <br />$3,440 <br />s0 <br />Install Conduit & <br />Costa Mesa <br />Nutmeg Pl <br />Fiber, EVP, Ped <br />$11,600 <br />l <br />$500 <br />SII,600 <br />$12,100 <br />$2,420 <br />s0 <br />U �mde <br />Install Conduit & <br />Fiber, CCTV <br />Costa Mesa <br />Baker St <br />Camera System, <br />Cabinet Upgrade, <br />$61,300 <br />f <br />$2,500 <br />561,300 <br />$6300 <br />$12,760 <br />50 <br />Battery Backup, <br />ade <br />EVP, Ped Upgrade <br />Costa Mesa <br />Adams Ave <br />Install Conduit & <br />Fiber, EVP <br />58,000 <br />1 <br />$400 <br />$8,000 <br />$8,400 <br />$1,680 <br />SO <br />Mesa <br />Costa Mesa <br />Verde/1'otnrson <br />EVP, tied Upgrade <br />$9,300 <br />t <br />5400 <br />S9,3Uf1 <br />$9,700 <br />$1,940 <br />SO <br />Cabinet Upgrade, <br />Costa Mesa <br />Merinnac Wy <br />Battery Backup, <br />$45,800 <br />1 <br />$1,900 <br />$45,800 <br />547,700 <br />$9,540 <br />SO <br />@VP, Ped U, mete <br />Install Conduit & <br />Fiber, CCTV <br />Costa&lese <br />Fair Di <br />Camera System' <br />Cabinet Upgrade, <br />S60,100 <br />i <br />52,500 <br />560,100 <br />562,600 <br />512,520 <br />$0 <br />Battery Backup, <br />EVP, Pod Upgrade <br />Costa Mesa <br />Harbor Ctr <br />EVP, Ped Upgrade <br />58,100 <br />1 <br />$400 <br />$8,100 <br />S8,500 <br />$1,700 <br />So <br />CCTV Camera. <br />_ <br />Costa Mesa <br />Wilson St <br />System, Cabinet <br />Upgrade, EVP, Ped <br />$41,300 <br />1 <br />SI,700 <br />$41,300 <br />543,000 <br />$8,600 <br />so <br />U n rflde <br />CC 'f V Camera <br />_ <br />. <br />Costa Mesa <br />Victoria St <br />System, Cabinet <br />$41,300 <br />1 <br />$1,700 <br />$41,300 <br />$43,000 <br />$8,600 <br />$0 <br />Upgrade, EVP, Pod <br />Upgrade <br />Install Conduit & <br />Costa Mesa <br />Hamilton $I <br />Fiber, Ethernet <br />Communication, <br />S48,300 <br />1 <br />$2,000 <br />$48,300 <br />$50,300 <br />$10,060 <br />50 <br />BVP, Pml U. rade <br />Install Conduit fi <br />_ <br />Fiber, CCTV <br />Costa Mesa <br />Buy St <br />Cumora System, <br />Ethernet <br />$87,600 <br />1 <br />53,600 <br />587,600 <br />591,200 <br />$18,240 <br />$0 <br />Conan LIT) icadoil, <br />EVP, Pod Upgl'adc <br />10 <br />25C -34 <br />