My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/21/2015
>
25C - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2015 5:12:00 PM
Creation date
4/16/2015 5:07:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
4/21/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*: Details of improvement and cost are listed in the Appendix B <br />11 <br />25C -35 <br />Install Conduit & <br />Fiber, CCTV <br />Camem System, <br />Costa Mesa <br />19th St <br />Ethernet <br />Communication, <br />$74,300 <br />1 <br />$3,100 <br />5'74,300 <br />MAN <br />$15,480 <br />$0 <br />Cabinet Upgrade, <br />Battery Backup, <br />EVP, Ped U � grade <br />Costa Mesa <br />Newport Blvd <br />lVitson St & <br />Ethernet <br />Costa Mesa <br />Center Nvay <br />Communication, <br />$8,000 <br />1 <br />51,400 <br />$8,000 <br />$9,400 <br />S1,880 <br />$0 <br />CmnrollerUt lade <br />Ethernet <br />Costa Mesa <br />TMC <br />Communication, <br />$58,000 <br />1 <br />51,400 <br />$58,000 <br />$59,400 <br />$11,880 <br />50 <br />:fMC UL - <br />Subtotal: Estbantert eocl of "Pi opnserf Signrr(System Lnprovemems"(tatal <br />oornGGatil <br />$65,900 <br />$1,468,800 <br />S 1,5:14,700 <br />$280,340 <br />$26,600 <br />g. Contingency r n 10 °/a of tlxe €&timated costs of "Proposer( Signal System <br />_ <br />In rovennents' <br />S146,1180 <br />$29,376 <br />$0 <br />h. Cpnstnuuion management u r m 15% of the estimated costs of "Proposed <br />— <br />Si mnl $ stem Im rovements" for support mid_inspection costs) <br />$220,320 <br />50 <br />$44,0(>4 <br />Total 2- Signal System Improvements, Cfntstrinetien Suppurt(lnspeetlml, <br />and Confln -ang Costs <br />$1,901,900 <br />$309,716 <br />S70,664 <br />Totals 1+2 <br />$2,211,900 � <br />$442,3AD_____. <br />*: Details of improvement and cost are listed in the Appendix B <br />11 <br />25C -35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.