Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street 1Mdeninq Protect Warner Ave to Saint Andrew Place (Phase IV) <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />(f) For a project within the vicinity of a private airstrip, would the project result in a safety <br />hazard for people residing or working in the project area? <br />The project site is not within the vicinity of a private airstrip and would not create any safety hazard. The <br />proposed project would not create additional significant impact. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />(g) Impair implementation of or physically interfere with an adopted emergency response plan or <br />emergency evacuation plan? <br />The disruption of traffic and restricted access along Bristol Street between Warner Avenue and Saint <br />Andrew Place during construction would affect the mobility of emergency vehicles. However, provisions <br />would be made for interim access and traffic control plans would be prepared prior to each step in the <br />construction process. Advance warning and information signs would be used to reduce the confusion <br />motorists may experience during the construction process. It is expected that Bristol Street would remain <br />open during construction. Although the proposed project may interfere with an emergency evacuation plan, <br />it would be short term during construction, and the mobility would improve once the project is completed. <br />Compliance with mitigation measures from the 1990 Final EIS /EIR would ensure that impacts are not <br />greater than previously analyzed in the 1990 Final EIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />(h) Expose people or structures to a significant risk of loss, injury or death involving wildland <br />fires, including where wildlands are adjacent to urbanized areas or where residences are <br />intermixed with wildlands? <br />The proposed project site is developed with various urban uses within the City. There are no wildlands in the <br />project vicinity and no new significant impacts would result with project implementation. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />3.9 Hydrology and Water Quality <br />This section corresponds with Section IV, Environmental Consequences and Mitigation Measures, <br />subsections C, Erosion Impacts, D, Floodplain /Floodway Encroachment, and F, Water Quality of the 1990 <br />Final EIS /EIR. <br />(a) Violate any water quality standards or waste discharge requirements? <br />As part of Section 402 of the Clean Water Act, the EPA has established regulations under the National <br />Pollution Discharge Elimination System ( NPDES) program to control direct stormwater discharges. The <br />proposed project would be required to comply with the NPDES program for the Santa Ana Regional Water <br />Quality Control Board (SARWQCB). <br />ANA 305 -194 (PER 02) CSA (AUGUST 2014) 133867 YU 39 <br />