ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Project Warner Ave to Saint Andrew Place (Phase IV) <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />(f) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or <br />pedestrian facilities, or otherwise decrease the performance or safety of such facilities? <br />The proposed project supports the use of public transportation and it would not conflict with any alternative <br />transportation plan and would increase safety. The proposed project would not result in impacts greater than <br />as described in the 1990 Final EIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />3.17 Utilities and Service Systems <br />This section corresponds with Section IV, Environmental Consequences and Mitigation Measures, <br />subsections S, Effect on Utilities, and V, Construction Impacts of the 1990 Final EIS /EIR. <br />(a) Exceed wastewater treatment requirements of the applicable Regional Water Quality <br />Control Board? <br />The proposed project would not generate any sewer demand and would not change the sewer quality. No <br />impacts are anticipated in this regard. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />(b) Require or result in the construction of new water or wastewater treatment facilities or <br />expansion of existing facilities, the construction of which could cause significant <br />environmental effects? <br />The proposed road widening project would not generate the need for water and wastewater services from the <br />City of Santa Ana Public Works Agency and the Orange County Sanitation District, respectively. The <br />existing sewer and water lines beneath Bristol Street would not be relocated. The proposed project would not <br />create any new significant environmental impact. Impacts would be similar to those identified in the 1990 <br />Final EIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />(c) Require or result in the construction of new storm water drainage facilities or expansion of <br />existing facilities, the construction of which could cause significant environmental effects? <br />The project site is already fully developed and the proposed project would not change the runoff volume <br />significantly. Instead, the proposed project would improve existing drainage flow by constructing properly <br />designed curb and gutter along the edges of Bristol Street. Implementation of the proposed project would not <br />result in any new significant environmental impact. Impacts would be similar to those identified in the 1990 <br />Final EIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />ANA 305 -194 (PER 02) CSA (AUGUST 2014) 133867 YU 53 <br />