My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - AUTO METER INFRASTRUCTURE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/05/2015
>
25I - AGMT - AUTO METER INFRASTRUCTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 3:28:24 PM
Creation date
4/30/2015 3:21:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
5/5/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Public Works Agency I ADVANCED METERING INFRASTRUCTURE FEASIBILITY STUDY <br />PROJECT SUMMARY <br />Lincoln Electric Provided consulting services to assist LES with AM[ planning and evaluation This included <br />System reviewing the current state and trends in the market, documenting the required functionality <br />and associated benefits, estimating project cost and schedule, and developing an AM] business <br />case for LES decision - making. <br />PECO, an Exelon Providing program management and consulting for PECO Energy's Smart Grid /Smart Meter <br />Company, PA Program, which includes addressing PA's Act 129 smart meter technology procurement and <br />installation plans, PECO's DOE Smart Grid Investment Grant, and transitioning from Fixed <br />Network AMR to AMI technologies and business processes. <br />Southern Provided a range of smart grid consulting services to SMECO, including: <br />Maryland Electric Strategic assessment of AMI, MDMS, and related technologies <br />Cooperative '- Critical next steps /priorities for an integrated. Smart Grid Strategy and Roadmap <br />(SMECO) ' Business case analysis . <br />AMI,. MDMS, and Systems Integration Requirements and Smart Grid Roadmap <br />DR program design . and regulatory support <br />Overall program integration and management services <br />BLACK & VEATCH I A. Statement of Qualifications <br />251 -57 <br />Also working with PECO on development of Smart Grid /Smart Meter Operational Command <br />Center. Previously developed integration of PECO's Cellnet AMI Data into OSISoft PI Historian for <br />load management of transformers and secondary mains. <br />Pepco Holdings, <br />Helped PHI define a Smart Grid and Distribution Automation Strategy. The - roadmap leveraged <br />Inc. (PHI), mid- <br />technology convergence, system integration and implementation synergies of smart metering, <br />Atlantic U.S.. <br />distribution and substation distribution SCADA and advanced DIMS applications, <br />demand response and energy management applications, <br />Provided AMI consulting and implementation support, including change management and <br />implementation of our metrics tool, ESlntialT", to support PHI'songoing rollout of smart meters <br />across its operating companies, from meter performance assessment to network optimization to `. <br />assisting with planning of meter rollouts. <br />PPL Corporation, <br />Supported PPL's next generation AMI technology strategy. Evaluated current and future AMI <br />PA <br />and DA requirements and analyzed options for meeting the requirements. <br />San Antonio <br />Providing consulting services for the AMI Initiative to evaluate opportunities to leverage the CPS <br />`Water System, TX <br />Energy AMI system to include SAWS water meter and automation services'. Scope includes <br />-. <br />solution architecture, vendor evaluation, pilot project definition, and business case <br />development.` <br />SaskPower <br />Supported SaskPower in a broad capacity to evaluate business opportunities related to smart <br />metering and smart grid. Created an AMI strategy working document and presented a merged <br />AMI /smart grid vision presentation to the largerT &D Management team. We engaged the <br />organization to identify benefit areas, determine solution requirements, identify broad IT <br />reference models, analyze change management requirements, and develop high -level base <br />designs. Developed the financial model and created an integrated business case for the utility's <br />Board of Directors approval in 2010, as well as a procurement strategy and project plan. <br />Southern Provided a range of smart grid consulting services to SMECO, including: <br />Maryland Electric Strategic assessment of AMI, MDMS, and related technologies <br />Cooperative '- Critical next steps /priorities for an integrated. Smart Grid Strategy and Roadmap <br />(SMECO) ' Business case analysis . <br />AMI,. MDMS, and Systems Integration Requirements and Smart Grid Roadmap <br />DR program design . and regulatory support <br />Overall program integration and management services <br />BLACK & VEATCH I A. Statement of Qualifications <br />251 -57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.