My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (PARK MAINT.) - 2015 3RD AMEND
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (PARK MAINT.) - 2015 3RD AMEND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 10:03:45 AM
Creation date
5/12/2015 1:42:51 PM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPE
Contract #
A-2015-028
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
2/17/2015
Expiration Date
1/31/2016
Insurance Exp Date
4/1/2015
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
work operations are subject to compliance with all local Noise Restrictions. Operation of tree work <br />equipment shall not take place between the hours of 9:00 p.m. and 7:00 a.m. weekdays, or between <br />9:00 pm and 8:00 am on weekends (Saturday and Sunday). Emergencies are exempt from any time <br />restrictions. <br />d. All tree work done to SAPRF trees must comply with all tree related safety requirements as stated in <br />the safety standards ANSI Z133.1 -1994 of the American National Standards Institute, Inc. 1430 <br />Broadway, New York, NY 10018. <br />1.14 SITE CLEANUP <br />Cleanup of any debris resulting from any tree pruning operations shall be promptly and properly <br />accomplished. The work area shall be kept safe at all times until all operations are completed. Under no <br />circumstances shall the accumulation of debris be allowed in such a manner as to result in a hazard to <br />the public. All debris from tree operations shall be cleaned up each day before the work crew leaves the <br />site, unless permission is given by an authorized SAPRF representative to do otherwise. All lawn areas, <br />parkways, streets and sidewalks shall be raked and /or blown clean, and all brush, branches, or other <br />debris shall be removed from the site. Areas are to be left in a condition equal to or better than that <br />which existed prior to the commencement of tree pruning operations. <br />All cuttings, branches, wood chips and other debris shall be cleared from the site and disposed of by the <br />Contractor. The Contractor shall obtain permits required for this purpose. Disposal expenses will be the <br />Contractor's responsibility. Debris, such as wood chips, shall be left on property only at the direct and <br />specific request of the owner and an authorized SAPRF representative. Firewood four (4) inches <br />diameter or larger will be left at the work location in a safe manner, unless the wood is not usable as <br />firewood. All firewood to be removed (wood four (4) inches of diameter or larger) must be authorized <br />by an SAPRF representative. <br />1.15 TIME FOR COMPLETION <br />If awarded this project, the Contractor agrees to complete the work within the time parameters jointly <br />agreed upon by the City, SAPRF, and the Contractor prior to work commencement, unless specific time <br />deadlines are specified elsewhere in these specifications. Once the work has commenced, the Contractor <br />shall diligently prosecute the same to completion. <br />1.16 PAYMENTS WITHHELD /PENALTIES <br />Should the Contractor fail to finish the work as agreed upon in these specifications the Contractor shall <br />be charged by SAPRF penalties in the amount of five hundred dollars ($500.00) for each calendar day <br />that the work remains incomplete beyond the dates specified. Any amount so charged shall be deducted <br />by the SAPRF from any monies which otherwise are or become payable to the Contractor. <br />In case all the work called for is not completed in all parts and requirements within the time specified, <br />the SAPRF shall have the right to grant or deny an extension of time for completion, as may be seen best <br />to serve the interests of the SAPRF. The Contractor shall not be assessed with penalties during the delay <br />in the completion of the work caused be acts of God or of the Public Enemy, acts of the State, floods, <br />epidemics, quarantine, restrictions, strikes, or unusually severe weather. The SAPRF representative will <br />ascertain the facts and the extent of the delay, and their findings thereon shall be final and conclusive. <br />1.17 SUBCONTRACTORS <br />Subcontractors are not allowed without written approval from the Park Superintendent. Subcontractors <br />used in the performance of this project shall be listed in the Contractors Bid Proposal. Subcontractors <br />shall be properly licensed by the State of California as a contractor to perform work of this specialty and <br />hold a valid business permit and certificate of insurance with the City of Santa Ana. Should any <br />
The URL can be used to link to this page
Your browser does not support the video tag.