Laserfiche WebLink
subcontractor fail to perform the work undertaken by him to the satisfaction of the SAPRF, said <br />subcontractor shall be removed immediately from the project upon the request of the SAPRF and shall <br />not again be employed on the project. The Contractor shall be held liable for the correction of any <br />deficient work. <br />1.18 ADDITIONS AND /OR DELETIONS OF WORK <br />The SAPRF representative reserves the right to add and/or delete tree work on this project as deemed <br />necessary and in the best interest of the SAPRF. Additions and /or deletions shall be made at the unit <br />price accepted by SAPRF upon award of contract. <br />1.19 <br />An authorized SAPRF representative will inspect the work performed by the contractor to insure <br />completion of the pruning in accordance with SAPRF Pruning specifications. Should more than two (2) <br />inspections be required on trees needing additional work, the contractor will be billed for SAPRF staff <br />time. <br />Page 47 <br />